Run | Position | Comment |
---|---|---|
630 | Start position | |
631 | y+3 mm | No YARR |
632 | y+2 mm | No YARR |
633 | same | Retake with YARR (now in all subsequent runs). Delta y (rows) = 0-100 |
634 | y-2 mm | Delta Y = 50-150 |
635 | y-4 mm | Delta y = 120-220 |
636 | y-4 mm | Delta y = 220-300, Delta x = 45-80. Stopped beam for RP to survey Koji's modules |
637 | y-2 mm | only got 1000 events before the RCE gave up (wasn't quite to 2000 from 636 because it was stopped manually) |
638 | same as 637 | X position is -67 mm |
640 | x-4 mm | Huge noise burst! See the timing distribution in ./bin/run640.root |
641 | y+4 mm | no noise burst |
642 | y+4 mm | noise burst |
643 | same as 642 | noise burst |
644 | y+2 mm | |
645 | y+2 mm | |
646 | x-2 mm | |
647 | x-2 mm | X position is -75 mm |