Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Participants: 

LBNL: Katie Dunn, Timon Heim, Peilian Liu, Ben Nachman, Maurice Garcia Sciveres

SLAC: Nicole Hartman, Peter Kim, Martin Kocian, Rob Mina, Francesco Rubbo, Su Dong

ANL: Sergei Chekanov

KEK: Koji Nakamura 

Shift Schedule (tentative) 

DayShiftShifter
Thursday Sep/299am – 9pmSergei, Su Dong, Timon, Ben, Katie
Thursday – Friday9pm – 9amPeilian, Bin (->1am), Timon (->5am), Sergei (4am->)
Friday Sep/309am – 9pmSu Dong, Nicole, Sergei (->11am)
Friday – Saturday9pm – 9amTimon (->5am,10am->), Peilian, Rob (5am->)
Saturday Oct/19am – 9pmSu Dong, Rob(->10am), Ben (10am->), Timon(10am-2pm)
Saturday – Sunday9pm – 9amNo shift, LCLS at low energy. Ben and Su Dong switching cold->warm setup
Sunday Oct/2

9am – 9pm

Ben, Peter
Sunday – Monday9pm – 9amSu Dong, Nicole
Monday Oct/39am – 9pmFrancesco?/Martin?, Peter?
Monday – Tuesday9pm – 9amBen, Rob

Event Log

Sep/19-26 prep      

Operations team: Su Dong , Rob Mina 

Sep/19: Previous dissembled Caladium is reassembled by Test Facility in the ESTB tunnel but parked on the side as beam pipe was reinstalled for a down stream experiment (somewhat of a surprise for us) this week. Caladium mover control electronics is still missing and to be installed next week. We checked the re-connections and found a few errors and missing links which got corrected. Connected the double chip module 94-04-03 as DUT with upgraded DUT CAT6 data cables and tried pixel digital calibration which worked as expected. Reordered the power supplies on the remote power strip to match the original panel in EPICS.     

Sep/20

...

: Checking with Carsten about what is really going on this week, it turned out T-542 (sFlash) is taking the entire period Sep/22-Sep/26 so that the originally agreed Sep/26 for us has evaporated and we were never informed of that change. 

Sep/23

...

: Checked with sFlash at ESA control room. The intense scene confirmed the fear that they will probably need the entire period, including Monday.

Sep/26

...

: sFlash is continuing with their runs so that we are unlikely to have any chance to run for Monday, considering that Caladium still needs to be brought onto beam line after beam pipe removal. So Monday is expected to mainly doing lab test of the first RTI module to get proper configurations prepared and check other preparation items.   

...

  • Priority is to debug FE65_P2 readout integration with telescope (Timon, Ben) and taking telescope whenever needed,
  • Install the 2nd RTI SC module into the ESA DUT seat to do in situ threshold tuning (Sergei,SD).
  • Threshold tuning for the first RTI SC module at group C lab (SD,Francesco,Rob,Nicole)
  • HV remote control/mon with EPICS (Ben,SD with help from Mike)
  • possible telescope geometry optimization (SD)
  • Presentation of [slides] of our plan and beam requirement to MCC (SD) at the 4pm 4:15pm accelerator weekly planning meeting next to the accelerator control room at the ground floor of B52. Everyone is welcome.      
  • Discuss preparation status, run plan and shift assignment at ESA control room at 5pm. 

...

  • RTISC2B replaced the 93-04-03 as the RCE DUT to get threshold tuning going for it.
  • When attempting to move the DUT closer to beamline we finally realized the oddity of the vertical position was due to the DUT stage mounted upside down. Juan corrected the mounting and now position close to be central.
  • Sergei installed a script duplicate.sh in the moduleconfig directory on esadutdaq1 so that one clone an existing module's RCE DUT config directory into a new module's starting configuration with underlying sud-directory file name to follow the new module name.    
  • The Research Yard construction people are unhappy about us rushing across the area in speed so that we are currently disallowed to go to ESA from the Research Yard ground floor through Gate 17/SSRL route. Everyone should go to ESA from Gate 30 to the top level counting room then down the stairs to ESA hall. If we have to drive in with equipment, we can give Keith Jobe a notice to arrange the passage via Research Yard. 

  • Timon exercised first integration of YARR readout infrastructure with EUDAQ: YARR Producer correctly booted up in EUDAQ Run Control. Correctly receiving configure transition and acknowledge completion while actual configuration content and event loop handshake still in progress.     
  • Re-orientated the RTI module by mounting inside the L to give some space for the HV LEMO bend not touching EUDET. The HV socket facing perpendicular to the PCB is not test beam friendly. TImon mounted the FE65_P2 nad looks like RTI and FE65_P2 are reasonably aligned in height and horizontal position to go together. Just some DUT stage fine shifts should bring the DUT to beam.

  • Segei's threshold tuning for RTISC2B is giving high noise at 500e. Realized we didn't tape the sensor window. Proper blacktake hard to find. Kluged some thicker tape for now. Simple threshold scan didn't get sensible results. To be tried again tomorrow.   

Sep/29

Plan of the dayTentative Shift assignments:

...

 

  • ESA search for returning to controlled access is either ~9am or ~11am. First beam by noon ? 
  • Preparation the RTISC2B + FE65_P2 pair DUT suite for first beam: 
    • DUT stage fine adjustment to align DUT into beamline and horizontal move of telescope into beam. Visually locate FE65_P2 window wrt RTI. 
    • Adjust overall EUDET planes to pack closer and narrow the DUT region. Needs an LEMO-L for the RTI HV socket to avoid HV cable bowing out to EUDET. 
    • Proper black tape for RTI sensor window and recheck threshold tuning with taped window.
    • Further auto-trigger integration of YARR with EUDET.
  • Continued threshold tuning for RTISC4A in the lab to get ready to go in later, and cross check on noise effects seen on RTISC2B.   

 

...