  • RTISC2B replaced the 93-04-03 as the RCE DUT to get threshold tuning going for it.
  • When attempting to move the DUT closer to beamline we finally realized the oddity of the vertical position was due to the DUT stage mounted upside down. Juan corrected the mounting and now position close to be central.
  • Sergei installed a script duplicate.sh in the moduleconfig directory on esadutdaq1 so that one clone an existing module's RCE DUT config directory into a new module's starting configuration with underlying sud-directory file name to follow the new module name.    
  • The Research Yard construction people are unhappy about us rushing across the area in speed so that we are currently disallowed to go to ESA from the Research Yard ground floor through Gate 17/SSRL route. Everyone should go to ESA from Gate 30 to the top level counting room then down the stairs to ESA hall. If we have to drive in with equipment, we can give Keith Jobe a notice to arrange the passage via Research

    Yard 

    Yard. 

Tentative Shift assignments:

Shift TimeShifter
Thursday 9am--9pmSergei, Su Dong,Timon,Ben,Katie
Thursday 9pm--9amPeilian, Ben (->1am), Timon (->5am), Sergei (4am->)
Friday 9am--9pmSu Dong, Nicole, Sergei (->11am)
Friday 9pm--9amTimon (->5am), Peilian, Rob (5am->10am)
Saturday 9am--9pmSu Dong, Ben (10am->), Timon (10am->2pm), Rob(9-10am)
Saturday 9pm--9amNo shift. LCLS going to low energy.
Sunday 9am--9pmBen, Peter
Sunday 9pm--9amSu Dong, Nicole
Monday 9am--9pmFrancesco(?)/Martin(?), Peter(?)  
Monday 9pm--9amBen, Rob