...
Done 4/20
Deliverable | Complete Date | Responsible | Blockers/Issues |
---|---|---|---|
Write demo eTraveler procedures to show Walt Innes how eTraveler can be used to monitor and control aux elex inventory | Done 4/20/16 | Robert | |
With Walt Innes, plan assembly sequence and eTraveler procedures for ~500 commercial electronic parts | Complete TBD | Robert | |
Write eTraveler procedures for inventory control of commercial elx parts | 6/15 | Robert/Mark | |
Write eTraveler procedures for testing of elx assemblies as needed (e.g. Camera protection system) | Complete TBD | Robert | |
Consult with SLAC Camera subsystems (Cryo, CBM, Shutter, I&T) on assembly sequences, scope and "load balancing" for writing eTraveler procedures | 6/15 | Mark/Robert | |
Plan for Camera operations & maintenance documentation, relationship to eTraveler | 7/15 | Mark/Robert |
|
...