Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

2014-03-19-CSPAD-CXI-DS1-Metrology.xlsx

...

...

  • The DS1 detector was rebuilt on March 12-17 2014.
  • Thus for the DS1:
    • the Milathianaki experiment and later should use the 2014-03-19 metrology
    • the Yachandra experiment and earlier should use the previous 2013-12-20 metrology
  • The DS2 should use the 2013-12-12 metrology

...

2014-05-15-CSPAD-CXI-DS2-Metrology.xlsx

 

2014-08-27-CXI-DS2-Metrology.xlsx

2014-09-24-CXI-DS1-Metrology.xlsx

Attached, the most recent CXI metrology files. These replace the May 2014 versions and should be used for all experiments after September 24, 2014.

Changes in CXI-DS1:

  • Quad 3 (zero based counting) reworked; metrology updated in the attached file: "DS1-Metrology-Sept-24-2014"
  • Q3 Z values measured properly
  • Mikhail, please double check Q3 values for consistency
  • The other 3 quads (Q0, Q1, Q2) are unchanged (as in the previous metrology: May 15 2014).
  • Please note that this camera has been renamed. Possible new name: "CXI Camera 1"+ version number. Jason, could you please confirm the exact name and version.

Changes in CXI-DS2:

  • Quad 1 (zero based counting) reworked; metrology updated in the attached file: "DS2-Metrology-Aug-27-2014"
  • Q1 Z values: measured incorrectly (OGP bug?), please discard.
  • Mikhail, could you please check Q1 values for consistency?
  • The other 3 quads (Q0, Q2, Q3) are unchanged (as in the previous metrology: May 14, 2014).
  • Please note that this camera has been renamed. Possible new name: "CXI Camera 2"+ version number. Jason, could you please confirm the exact name and version.

As always, these excel metrology files are NOT FOR DISTRIBUTION to avoid user confusion. Only Mikhail's curated version should be distributed and used.

 

 

 

References