DAQ Mapping

MPOD Power Map

Table as of 11/17/2014 

GUI FEB IDPhysical FEBStatusComment
0L1t

OK

 
1

L2-3t

OK 
2L5tOK 
3L6tOK 
4L4tOK 
5L4bOK 
6L5bOK 
7L6bOK 
8L2-3bOK 
9L1bOK 
GUI Flange IDPhysical Flange BoardStatus
01 (top)OK
12OK
23OK
34 (bottom)OK

 

 

Reloading PGP card drivers

Typically after a reboot we need to reload the pgp card driver. 

$ cd /u1/pgpcard/software/driver_old/

$ ./pgpcard_load


 

OLD: Take a calibration run with expert SVT GUI

 

Start the DAQ:

 

$ cd /u1/software/software_new

...

Check that the hybrid currents measured are ok. Sync status for each channel can be seen in register RceCore/DataPath[x]/Synced, 1xf for powered channels.

 


 

Test Run SVT Group C Setup

 

Group C SVT test setup