Area | Physical Location |
---|
LR20 | Laser Room (Upstairs, near sector 20) |
IN20 | Injector |
LI20 | LINAC Sector 20 |
LI21 | LINAC Sector 21 |
LI22 | LINAC Sector 22 |
LI23 | LINAC Sector 23 |
LI24 | LINAC Sector 24 |
LI25 | LINAC Sector 25 |
LI26 | LINAC Sector 26 |
LI27 | LINAC Sector 27 |
LI28 | LINAC Sector 28 |
LI29 | LINAC Sector 29 |
LI30 | LINAC Sector 30 |
MCC0 | Main Control Center (Bulding 005) |
BSY0 | Beam Switchyard |
BSYS | Beam Switch Yard South |
BSYN | Beam Switch Yard North |
LTU0 | LINAC-to Undulator Switchyard |
LTU1 | LINAC-to-Undulator Line 1 |
UND1 | Undulator on Line 1 |
DMP1 | Beam Dump on Line 1 |
FEE1 | Front End Enclosure on Line 1 |
NEH1 | Near Experimental Hall on Line 1 |
XRT1 | X-Ray Tunnel on Line 1 |
FEH1 | Far Experimental Hall on Line 1 |
SYS0 | LCLS System |
SYS1 | FACET System |
SYS2 | LCLS-II System |
SYS3 | LCLS-III System |
SYS4 | NLCTA System |
SYS5 | SPEAR System |
SYS6 | X-Band Test Area |
SYSW | Global System West |
SYSE | Global System East |
GBL0 | Global to all Machines |