  • Hovanes will implement the flange LV and hybrid LV channels in EPICS IOC and let Bryan know.
  • Ani will crate a preliminary version of the alarm configuration for SVT voltages.
  • Cables for the motors will be build at JLab and Hovanes will sent at least one of them to Takashi. 
  • Pelle will check with SVT engineers about the bypass flow and the flow meter for the FEC chiller.  
  • Hovanes, Stepan and F.-X. will stay in touch with JLab PSS group regarding the accelerator's FSD input for SVT interlocks and come up with a plan by the end of February. (from the previous meetings)
  • Pelle will find out when the SVT full test at SLAC will take place and let Bryan know by April , so that Bryan can make plans. (from previous meetings)
  • F-X. will send a drawing of where the beamline motors need to be for HPS 2015 so that Denny can start procuring and making motor cables and laying them in the Hall. (from previous meetings)

...