Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Table 1.10

Area

Physical Location

AS01

Accelerator Structure Test System(ASTA)

LI00

LINAC Sector 0

LR20

LCLS Laser Room (Upstairs, near sector 20)

LA20

FACET Laser Room (Upstairs, near Sector 20)

IN20

Injector

LI20

LINAC Sector 20

LI21

LINAC Sector 21

LI22

LINAC Sector 22

LI23

LINAC Sector 23

LI24

LINAC Sector 24

LI25

LINAC Sector 25

LI26

LINAC Sector 26

LI27

LINAC Sector 27

LI28

LINAC Sector 28

LI29

LINAC Sector 29

LI30

LINAC Sector 30

MCC0

Main Control Center (Bulding 005) OBSOLETE

BSY0

Beam Switchyard Common-line

BSYN

Beam Switchyard North Arc

BSYS

Beam Switchyard South Arc

BSYA

Beam Switchyard A-line

ESA0

End Station A and Beam Dump East

BSYB

Beam Switchyard B-line

LTU0

LINAC-to Undulator Switchyard

LTU1

LINAC-to-Undulator Line 1

UND1

Undulator on Line 1

DMP1

Beam Dump on Line 1

FEE1

Front End Enclosure on Line 1

NEH1

Near Experimental Hall on Line 1

XRT1

X-Ray Tunnel on Line 1

FEH1

Far Experimental Hall on Line 1

XT01

X-Band Test Area

SYS0

LCLS-I System

SYS1

FACET System

SYS2

LCLS-II System

SYS3

LCLS-III System

SYS4

NLCTA System

SYS5

SPEAR Systems

SYS6

X-Band Test Area

SYS7

ASTA Test Area

SYSW

Global System West

SYSE

Global System East

GLB0

Global to all Machines

...

Table 1.11

Area

Position Prefix Codes

Physical Position

LR20

  L

Laser Room (Upstairs, near sector 20)

 

IN20

B

Beam Line

 

K

Klystron Gallery

 

W

Waveguide

 

R

RF Equipment Hut

 

L

Laser Line

 

LI20

B

Beam Line

 

W

Waveguide

 

K

Klystron Gallery

 

E

Instrumentation Equipment Alcove

 

LI21

B

Beam Line

 

W

Waveguide

 

K

Klystron Gallery

 

E

Instrumentation Equipment Alcove

 

LI22

B

Beam Line

 

W

Waveguide

 

K

Klystron Gallery

 

E

Instrumentation Equipment Alcove

 

LI23

B

Beam Line

 

W

Waveguide

 

K

Klystron Gallery

 

E

Instrumentation Equipment Alcove

 

LI24

B

Beam Line

 

W

Waveguide

 

K

Klystron Gallery

 

E

Instrumentation Equipment Alcove

 

LI25

B

Beam Line

 

W

Waveguide

 

K

Klystron Gallery

 

E

Instrumentation Equipment Alcove

 

LI26

B

Beam Line

 

W

Waveguide

 

K

Klystron Gallery

 

E

Instrumentation Equipment Alcove

 

LI27

B

Beam Line

 

W

Waveguide

 

K

Klystron Gallery

 

E

Instrumentation Equipment Alcove

 

LI28

B

Beam Line

 

W

Waveguide

 

K

Klystron Gallery

 

E

Instrumentation Equipment Alcove

 

LI29

B

Beam Line

 

W

Waveguide

 

K

Klystron Gallery

 

E

Instrumentation Equipment Alcove

 

LI30

B

Beam Line

 

W

Waveguide

 

K

Klystron Gallery

 

E

Instrumentation Equipment Alcove

 

BSY0

B

Beam Line

 

E

Surface Equipment Building (Bldg 136, 106, 106, 5)

 

P

BSY Pump Station (P0, P1, P2, P3, P5)

 

 

BSYA

B

Beam Line

 

E

Surface Equipment Building (Bldg 136, 106, 106, 5)

 

P

BSY Pump Station (P0, P1, P2, P3, P5)

 

 

BSYB

B

Beam Line

 

E

Surface Equipment Building (Bldg 136, 106, 106, 5)

 

P

BSY Pump Station (P0, P1, P2, P3, P5)

 

 

BSYN

B

Beam Line

 

E

Surface Equipment Building (Bldg 136, 106, 106, 5)

 

P

BSY Pump Station (P0, P1, P2, P3, P5)

 

BSYS

B

Beam Line

 

E

Surface Equipment Building (Bldg 136, 106, 106, 5)

 

P

BSY Pump Station (P0, P1, P2, P3, P5)

 

LTU0

B

Beam Line

 

E

Surface Equipment Building (Bldg 5 or 911)

 

LTU1

B

Beam Line

 

E

Surface Equipment Building (Bldg 105 or Bldg 406 or

 

 

Bldg 911 or Bldg 912 or Bldg 913)

 

MCC0

E

Equipment Rack Area (Bldg 5) OBSOLETE

 

C

Control Room

 

UND1

B

Beam Line

 

E

Surface Equipment Building (Bldg 913,921)

 

DMP1

B

Beam Line

 

E

Surface Equipment Building (Bldg B921)

 

FEE1

B

Beam Line

 

 

Hard (High-energy) through Branch (South) to Hutch 3 and beyond

 

1

Soft (Low-energy) Branch (North) to Hutch 1

 

2

Soft (Low-energy) Branch (Middle) to Hutch 2

 

E

Equipment Rack Alcove or Surface Equipment Building (Bldg 940)

 

NEH1

B

Beam Line

 

 

Hard (High-energy) Branch (South) to Hutch 3 and beyond

 

1

Soft (Low-energy) Branch (North) to Hutch 1

 

2

Soft (Low-energy) Branch (Middle) to Hutch 2

 

E

Surface Equipment Building (Bldg 950)

 

XRT1

B

Beam Line

 

 

Through Branch

 

4

North Branch to Hutch 4

 

5

Middle Branch to Hutch 5

 

6

South Branch to Hutch 6

 

E

Surface Equipment Building (Bldg 960)

 

FEH1

B

Beam Line

 

4

North Branch to Hutch 4

 

5

Middle Branch to Hutch 5

 

6

South Branch to Hutch 6

 

E

Surface Equipment Building (Bldg 999)

XT01

B

Beam Line

 

 

Surface Equipment Building (Bldb 062)

SYS0

 

LCLS-I System

SYS1

 

FACET System

SYS2

 

LCLS-II System

SYS3

 

LCLS-III System

SYS4

 

NLCTA System

SYS5

 

SPEAR System

SYS6

 

X-Band Test Area

SYS7

 

ASTA Test Area

SYSW

 

Global System West

SYSE

 

Global System East

GLB0

 

Global to all Machines

...