Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. The current baseline considers the HPS experiment installed inside the alcove downstream the CLAS12 experiment in Hall-B. This decision was taken after consultation with the JLAB management, but after the submission of the proposal in May'13. An addendum to the proposal and an implementation plan were developed to describe the feasibility as well as the impact on the schedule of both experiments. The old schedule as described in the proposal and presented at the DOE Review in July'13 is available V500. The preliminary closeout report  has many comments along the line of the consolidation of the schedule for the installation of HPS in the alcove, in particularly of the beamline and its explicit integration with the JLAB 12GeV upgrade. The most important comments are summarized in this table at the end of this page.  We are required to consolidate of the baseline schedule for the beamline  especially  to monitor the real impact of the tasks toward the HPS installation in September'14, as well as the commissioning in October'14. A draft schedule of the full experiment available V600  and an extract of the beamline only is available.  
    1. Plan and Elevation drawings of the Beamline baseline layout. (here\ )
    2. Ken's slides (here\ )
    3. Addendum to the proposal (here\ )
    4. Implementation plan (here https://confluence.slac.stanford.edu/download/attachments/146718320/HPS+Implementation+Plan+June+2013+v6.pdf?version=1&modificationDate=1382464427000)
  2. AOB (All)