Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Beam parameters - 150um beam spot

Operation

Log book

...

9/29/2013

...

9/30/2013

...

Operation plan:

  • Start with 5 foils (or maximum) and lowest current available to time in detector readout
  • 10Hz beam for each setting of beam intensity, foil thickness and bias voltage (5 min each)
  • Run baseline (1000k events at 100Hz) and save to file for each setting (2min)
  • Total time would be about 7mins/setting
  •  

25x7min/foils=175mins/foil

I(pC)\Bias (V)

120

180

250

350

400

450

500

lowest possible

x

x

x

x

x

x

x

0.01

-

x

 

x

 

 

x

0.1

-

x

 

x

 

 

x

1.0

-

x

 

x

 

 

x

10.0

-

x

 

x

 

 

x

100

-

x

 

x

 

 

x

highest possible

-

x

 

x

 

 

x

...

DAQ Desktop Setup

...

IP address: 172.27.244.72

...