...
- 6 full chassis @97.227k => 583.4k
- 7 5 blades w/IB added to existing empty slots @4.817k => 3324.72k1k
- 4 IB switches with cables @10.5k => 42k48k (includes active fiber IB cables for lustre switch)
- 2 60x2TB disk trays with controllers @34k => 68k62k
Total is $727k $717.5k for 1648 cores and storage expansion.
Gross bullet cluster core count would then be 4608 4576 (all IB)
costs are:
- ATLAS: 60 blades @4.9375k => 296.25k (960c)
- Theory: 97k + 75*4.817k => 130121.72k 1k (368c)
- PPA: 300.1k (320c)
...