  • 6 full chassis @97.227k  => 583.4k
  • 7 5 blades w/IB added to existing empty slots @4.817k => 3324.72k1k
  • 4 IB switches with cables @10.5k => 42k48k (includes active fiber IB cables for lustre switch)
  • 2 60x2TB disk trays with controllers @34k => 68k62k

Total is $727k $717.5k for 1648 cores and storage expansion.
Gross bullet cluster core count would then be 4608 4576 (all IB)

costs are:

  • ATLAS: 60 blades @4.9375k => 296.25k                    (960c)
  • Theory: 97k + 75*4.817k => 130121.72k 1k                              (368c)
  • PPA: 300.1k                                                              (320c)

...