Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Table 1.10

Area

Physical Location

LI00

LINAC Sector 0

LR20

Laser Room (Upstairs, near sector 20)

IN20

Injector

LI20

LINAC Sector 20

LI21

LINAC Sector 21

LI22

LINAC Sector 22

LI23

LINAC Sector 23

LI24

LINAC Sector 24

LI25

LINAC Sector 25

LI26

LINAC Sector 26

LI27

LINAC Sector 27

LI28

LINAC Sector 28

LI29

LINAC Sector 29

LI30

LINAC Sector 30

MCC0

Main Control Center (Bulding 005)

BSY0

Beam Switchyard Common-line

BSYN

Beam Switchyard North Arc

BSYS

Beam Switchyard South Arc

BSYA

Beam Switchyard A-line

ESA0

End Station A and Beam Dump East

BSYB

Beam Switchyard B-line

LTU0

LINAC-to Undulator Switchyard

LTU1

LINAC-to-Undulator Line 1

UND1

Undulator on Line 1

DMP1

Beam Dump on Line 1

FEE1

Front End Enclosure on Line 1

NEH1

Near Experimental Hall on Line 1

XRT1

X-Ray Tunnel on Line 1

FEH1

Far Experimental Hall on Line 1

XT01

X-Band Test Area

SYS0

LCLS-I System

SYS1

FACET System

SYS2

LCLS-II System

SYS3

LCLS-III System

SYS4

NLCTA System

SYS5

SPEAR Systems

SYS6

X-Band Test Area

SYS7

ASTA Test Area

SYSW

Global System West

SYSE

Global System East

GLB0

Global to all Machines

Special IN20 and BSY area Alarm Summary names  **Please note that these areas are special for alarms ONLY and not for general use.*

...