Detector Number | Type | Function | In DAQ? | Notes | Cabled? | Running? | Comments | ||||
---|---|---|---|---|---|---|---|---|---|---|---|
0 | Alvium | Beam spot | Yes | in-air | Yes | Will verify |
| 1 | ePix10k | Yes | Beam spot work completed and Alvium returned to XPP. |
1 | ePix10k | QO | Yes | in-vac | See: standard configuration | ||||||
1 | ePix10k | Q1 | Yes | in-vac | See: standard configuration | ||||||
2 | ePix10k | Q2 | QOYes | in-vac | See: standard configuration | ||||||
2 | ePix10KePix10k | Q3 | Yes | in-vac | See: standard configuration | ||||||
3 | ePix100a | F-XRTS | Yes | in-vac | standard XRTS, back-facing for forward | scatteringscattering "We have to see if we want to use the spectrometers so we will update this page accordingly" | |||||
4 | ePix100a | B-XRTS | Yes | in-vac | 'old-design' XRTS, front-facing for backward scattering "We have to see if we want to use the spectrometers so we will update this page accordingly" | ||||||
Not needed, per Eric Galtier.
| |||||||||||
6 | ePix100a | Small angle scattering | Yes | in-air | Also mounted on 500mm stage. Details? | ||||||
7 | VISAR1 | Check IOC. ioc-mec-streak-01/02 fail to connect to the streak PCs (win-ics-mec-visar1/2) at startup. I suspect the latter are powered down and need to be checked. | |||||||||
8 | VISAR2 | Check IOC. ioc-mec-streak-01/02 fail to connect to the streak PCs (win-ics-mec-visar1/2) at startup. I suspect the latter are powered down and need to be checked. |
Page History
Overview
Content Tools