The following is a digest of the T9 runs. Get the full list or the selected run from the pipeline or elogbook. (WORK IN PROGRESS).
In red color : Not to be used, due to mistake, or for specialist.
In blue color the runs numbers good for the statistics
Last run taken into account : 1334
Summary of the Digest
CU Position 1 (0°)
| Electron | Full Brem | Tagged |
---|---|---|---|
0.5 GeV | 20k (1204) |
| 275 k (1244-1258) |
1 GeV | 20k (1205) |
| 125 k (1208-1210) |
1.5 GeV |
|
| 50 k(1332, 1334) |
2.5 GeV | 60k (1201-1202 ) | 2,5 M (1181-1190) | 100 k (1177-1180) |
CU Position 2 (30°)
| Electron | Full Brem | Tagged |
---|---|---|---|
0.5 |
|
| 125k(1295, 1297-1300) |
1. GeV | 100k (1220) |
| 105 k (1214-1217) |
1.5 GeV |
|
|
|
2.5 |
| 2.5 M(1223-1231) | 105k (1233-1237) |
CU position 3 (50°)
| Electron | Full Brem | Tagged |
---|---|---|---|
0.5 | |
| 75 k+85 k =160 k |
1. | |
| 100k (1276-1279) |
1.5 |
|
|
|
2.5 | | 200k (1262-1271) | 100k (1272-1275) |
CU Position 4 (145°) x=749, y=0, z= -175 -215°
| Electron | Full Brem | Tagged |
---|---|---|---|
0.5 |
|
| 35k(1329-1330) |
1. |
|
| 50K (1319-1320) |
2.5 |
| 2Mo (1312-1318) |
|
Electron runs
Runs | Date | particle | energy | CU configuration | CU position | AD | notes | |||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1201 | 11/8 | e- | 2.5 | BT1 | 0° |
| av rate 34 HZ, CU instant rate 500 hz. S0 counts 21k per spîll | |||||||
1202 |
| e- | 2.5 | BT1 |
|
| 3 phasing errors for 30k events. run stopped due to beam off | |||||||
1204 | 11/8 | e- | 0.5 | |
|
| 20k | |||||||
1205 | e- | 1. | S0:14 k count per spill | |||||||||||
1218-1219 | 11/08 | e- | 1. |
| 30° (x,y,z)=(200,13.2,-48) | no | Accidentally started runs in synchronized Run Control. These were automatically aborted by the program. | |||||||
1220 | 22h06 | e- | 1. | BT1 | idem | No | 100K, S0 new trigger, S4 off | |||||||
1221 | 22h20 | e- | 1. | BT1 | Idem | YES | Refrence point before changing momentum | |||||||
1239 | 12/08 | e- | .5 |
| idem |
| 500 MeV electron with magnet off to check dump position with electron beam.9K | |||||||
1240 |
| .5 |
| idem |
| 500 MeV electron with magnet off to check dump position with electron beam. | ||||||||
1259 | 12/8 | e' | 1. |
|
|
| 1. Gev with magnet off | |||||||
1260 | 12/8 |
|
|
| 2.5 |
|
|
|
|
|
|
|
| magnet off, 2.5 GeV electrons to check beam and CU positions |
1261 | 12/8 |
| 2.5 |
|
|
|
| Magnet Off |
Tagged photon runs
Runs | Date | particle | energy | IMagnet | CU configuration | CU position | AD | notes |
---|---|---|---|---|---|---|---|---|
1176 |
| tagged g | 3GeV | 600 | BT1 | 0 degrees, center of tower 2 | yes | events in twr3? |
1177-1180 |
| tagged g | e beam at 2.5GeV | 600 | BT1 | 0 degrees, center of tower 2 | yes | magnet ON, 25K evts per run |
1206 |
| tagged gamma | e- 1GeV | 240 |
| idem |
| S0:14k count per spill |
1207 | 11/8 | tagged gamma |
| 240 |
| idem |
| idem with S1 in the trigger S0: 14 k count HW & DAQ trg :20 counts |
1208 | 11/8 11h34 | tagged gamma | e- | 240 |
| idem | yes | New trigger S3 in veto |
The beam spot on the tagger chamber is ok. the nunber of 'zero cluster evts' is also resonable.
The intervention on the trigger logic actually fixed the problem.
This is a good run for analysis. Bravo Mazziotta!
|
...
1209
...
11/8
13h29
...
...
e-
1GeV
...
...
...
...
...
Slits position changed from 51.5 to 52: S0 rate passed form 14 kCount to 20 kCount per spill
...
good tagged run with 1GeV beam.
trigger counts per spill (2 spill per cycle):
S0: 20k
HW: 80
DAQ: 70
- 25k | |||||||||
1209 | 11/8 | tagged gamma | e- | 240 |
| idem | yes and no | around 30k : SYNCHRONIZATION LOST ! | |
1210 | 11/8 | tagged gamma | e- | 240 |
| idem | yes | Synchronized Tagged gamma with 1GeV electron beam, going for 70k to get all the statistic : 100Kevents | |
1211-1213 | 11/8 | Tagged | 1 GeV | 180-240 | BT1 | 30° (x,y,z)=(200,13.2,-48) | | various Magnet currents for setting up | |
1214 | 11/8 | Tagged | e 1 GeV | 240 | BT1 | 30° (x,y,z)=(200,13.2,-48) |
| 25k | |
1215 |
| Tagged | e 1GeV | 240 | BT1 | idem |
| 25k | |
1216 |
| Tagged | e 1 GeV | 240 | BT1 | idem |
| 25K | |
1217 | 11/8 | Tagged | e- 1 GeV | 240 | BT1 | idem |
| 30k | |
1232 | 12/08 | Tagged | e- 2.5 GeV | 600 | BT1 | 30° (x,y,z)=(200,13.2,-48) |
| Not to be used , S4 not in the Trigger | |
1233-1237 | 12/8 | Tagged | e- 2.5 | 600 | BT1 | idem |
|
| |
1242 | 12/8 |
| e- 0.5 GeV | 100 |
| 0 degrees, center of tower 2 |
| GeometryVerifiation | |
1243 |
| Tagged | e- 0.5 GeV | idem |
| 0 degrees, center of tower 2 | yes | rate too low | |
1244-1245 | 12/08 | Tagged | e- 0.5 GeV | 120 |
| 0 degrees, center of tower 2 | yes |
| |
1246-1250 | 13:57 | Tagged | e- 0.5 GeV | 120 |
| 0 degrees, center of tower 2 | yes and no | Sync lost after 6476 evts | |
1253-1258 |
| tagged | e 0.5gev | 120 |
| 0 degrees, center of tower 2 | yes |
| |
1272 | 13/8 | Tagged | e 2.5 GeV | 600 | 48° | Table moved to 48 deg, in order to allow full calrecon |
| ||
1273-1275 | 13/8 | Tagged | e 2.5 GeV | 600 |
| 48° |
| table@(-50,12.3,-48, 48deg) |
|
1276-1279 | 13/8 | Tagged | e 1GeV | 240 |
| 48 |
| idem |
|
1287-1289 | 13/8 | Tagged | e 0.5 | 120 |
| 48° | Table(-50,12.3,-48, 48deg) |
| |
1290 |
|
|
|
|
|
|
| Junk |
|
1291-1294 | 13/8 | Tagged | e 0.5 | 120 |
| 48° | 85 k |
| |
1295, | 13/8 | Tagged | e 0.5 | 120 |
| 30 ° |
| 25k |
|
1297-1300 | 13/8 | Tagged | ie 0.5 | idem |
| 30° |
| 100 k |
|
1303 | 13/8 | Tagged | e 0.5 | idem |
| 30° |
| 25k |
|
1304 | 13/8 | Tagged | e 0.5 | 120 |
| 30° |
| 12 k . Rinsing number of events out of Sync |
|
1305 | 13/8 | Tagged | e 0.5 | 120 |
| 30° |
| 25k |
|
1308-1309 | 14/8 | Tagged | e 1GeV | 240 |
| 48° |
| 50K |
|
1310-1311 | 14/8 | Tagged | e 1 GeV | 240 |
| 30° |
| 50k |
|
1319-1320 |
| Tagged | 1 GeV | 240 |
| Pos 4, 145° | Yes | 50k. |
|
1321 | 14/8 |
|
|
|
| idem | Yes and no | sync lost after ?? |
|
1327-1328 | 14/8 | Tagged | 1 GeV | 240 |
| idem | Yes | 50k |
|
1329-1330 | 14/8 | Tagged | 0.5 GeV | 120 |
| Pos 4, 145° | yes | 35k |
|
1331 |
|
| 1.5 GeV | 360 |
| Pos 1, 0° | No | test beam position, no sync |
|
1332 | 14:27 | Tagged | 1.5 GeV | 360 |
| Pos 1, 0° | Yes | 25k |
|
1333 |
| Tagged | 1.5 | 360 |
| same | yes and no | no sync after <3600 evts |
|
1334-1335 | 14/8 | Tagged | 1.5 GeV | 360 |
| Same | yes | 50 k |
|
1336, 1337 |
|
|
|
|
| same |
| sync lost afyer 1733 and 1280 evts |
|
1338 |
|
|
|
|
| same |
| 25k |
|
1339-1342 |
|
|
|
|
| Pos 2 |
| 100k |
|
1343-1346 |
after 3.5k event slits closed to 51.5.
.
around 30k : SYNCHRONIZATION LOST !
stopping the run, first 30000 events should well sycnhronized...
for the event for which the synchronization was lost the DeltaEventTime was 128s that is corresponding to the turnover of the 2nd GASU counter. ||
|
| |
1210 | 11/8 |
|
|
|
|
|
| Synchronized Tagged gamma with 1GeV electron beam, going for 70k to get all the statistic |
|
|
|
|
|
|
|
|
|
Full-brem Photon runs
Runs | Date | particle | energy | I(Magnet) | CU configuration | CU position | AD | notes | ||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
11831181-1190 | 8/8 | e+g | 2.5 | 600 | BT1 | Pos 1 : 0 degrees, center of tower 2 | yes no | overall 2M evts - (false report of 300 A for 1185 in elogBook) | ||||||||
1222 | 11/8 |
|
| |||||||||||||
|
|
|
|
|
|
|
|
| ||||||||
2.5 GeV | 0 | Pos 2 : 30° (x,y,z)=(200,13.2,-48 | yes | check beam position | ||||||||||||
1223-1231 | 12/8 | e+g | 2.5 GeV | 600 | BT1 | idem | no | rate stable after adjustement in run 1223 | ||||||||
1262-1271 | 13/8 | e+g | 2.5 | 600 |
| pos 3 : 50° |
|
|
|
|
|
|
|
|
|
|
1312-1318 | 14/8 |
| 2.5 | 600 |
| Pos 4 : 145 ° |
| 2 Mevents |
Tagger calibration runs
Runs | Date | particle | energy (GeV) | CU configuration | CU position | AD | notes | |||
---|---|---|---|---|---|---|---|---|---|---|
1148-1164; 1166-1169 | 8/8 | e beam | various | BT1 | 0 degrees, various positions to align with tagger | yes | many different configurations, for expert only | |||
1170 |
| e beam | 1.5 | BT1 | 0 degrees, center of tower 2 | yes | dump in place, slits at 51.5 | |||
1171 |
| e beam | 1.25 | BT1 | 0 degrees, center of tower 2 | yes | magnet current 600A, direct tagger calibration | |||
1172 |
| e beam | 1.125 | BT1 | 0 degrees, center of tower 2 | yes | magnet current 600A, direct tagger calibration-NOT Synchronised | |||
1173 |
| e beam | 1.375 | BT1 | 0 degrees, center of tower 2 | yes | magnet current 600A, direct tagger calibration, slits reduce to 51 | |||
1174 | 8/8 | e beam | 1.125 | BT1 | 0 degrees, center of tower 2 | yes | magnet current 600A, direct tagger calibration | |||
1282 | 13/8 | e | BT1 | 48°, | Test - - Tagger calibration | |||||
1283 | 13/8 | e | 1 eEV | BT1 |
|
| 400 A | |||
1284 | 13/8 | e | 0.75 | BT1 |
|
| 330 A Synchronization Lost from the beginning... | |||
1285 | 13/8 | e | 0.75 GeV | BT1 |
|
| Magnet Current = 330A | |||
1286 | 13/8 | e | .5 |
|
|
| Magnet current @ 120 A |
|
CAL calibration runs
Runs | particle | energy | CU configuration | CU position | AD | notes |
---|---|---|---|---|---|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
...
Runs | Date | particle | energy | CU configuration | CU position | AD | notes |
---|---|---|---|---|---|---|---|
1191 1165 | 9 8/8 8h51 | - - |
| BT22(S3 only) | - - |
| monitor pedestal shift pedestal |
1165 1191 | 8 9/8 8h51 | - | - | BT22 (S3 only) | - | - | monitor pedestal shift |
1198 | 10/8 |
|
| BT22 |
|
| pedestal T ~22.3C |
1201 | 11/8 |
|
| BT22 |
|
| Pedestal T~ ? |
1281 | 13/8 |
|
|
|
|
| Pedestal- Trigger is now only S0 and the beam is off...have only muons deviated by the magnet. |
1348 | 14/8 |
|
| BT 22 |
|
| 5k |
ACD Calibration runs
Runs | Date | particle | energy | CU configuration | CU position | AD | notes |
---|---|---|---|---|---|---|---|
1192, 1193 | 9/8 | cosmic |
|
|
|
|
|
1194-1197 | 10/8 | cosmic |
| BT3 |
|
|
|
...
Runs | Date | particle | energy | CU configuration | CU position | AD | notes |
---|---|---|---|---|---|---|---|
4318 | 11/8 |
|
|
|
|
|
|
Cosmic run
Runs | Date | particle | energy | CU configuration | CU position | AD | notes |
---|---|---|---|---|---|---|---|
1307 |
|
|
|
|
|
| muons to check light leak |
Not to be used
Runs | Date | particle | energy | IMagnet | CU configuration | CU position | AD | notes | ||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
1200 | 11/8 | e- | 2.5 | 0 |
|
|
| ? Control Room ajustingSpill structure during run | ||||
1203 | 11/8 | e- | 0.5 | 0 |
|
| | S0 = 13k/spill, wrong focus setting | 1204 | |||
1238 | 12/8 |
|
|
|
|
|
| Software test | ||||
1241 | 12/8 |
|
|
|
|
|
| Software test | ||||
1280 | 13/8 |
|
|
|
|
|
| Test run for CU CAL pedestals - JUNK | ||||
1296 |
| 11/8 | e- | 0.5 | 0 |
|
|
| 9 mrad on XY 12 mrad on XZ |
|
| Junk |
1301-1302 |
|
|
|
|
|
|
| Junk | ||||
1322-1326 |
|
|
|
|
|
|
| junk | ||||
1347 |
|
|
|
|
|
|
| first run to prepare positron setting of tonight | ||||
1349-1354 |
|
|
|
|
|
|
| to check a lead brick position that should simulate the MMS.
|