LSSTCAM charge numbers:16714-B2121, 10139 16713-B2019B2311
Other upcoming tasks/issues coordinated with Nadine Kurita for LSST Camera can be found here Camera Documentation Planning.
...
Deliverable | Complete Date | Responsible | Blockers/Issues |
---|
Write eTraveler assembly and test procedures for Camera Cryostat including refrigeration system. | 11/30/16 | Mark/Robert | |
eTraveler standards, conventions,
best practices documentation. All Camera
subsystems must use | 5/16/16 | Mark/Robert | Standards complete, project to announce and socialize.
|
Write eTraveler procedures for CR wavefront sensor receipt, verification and shipment to SLAC | 6/10/16 | Mark | Input from Camera QA
|
eTraveler procedure for mechanical
assembly of raft electronics boards
(attach coldbars and FPGA heat sink) | Done 5/4/16
| Robert | |
eTraveler procedure for raft electronics
board initial testing (bring up board and
load firmware. Prep for TS-REB testing) | Complete 5/23
| Robert | |
Meet with Camera on what RGA snapshots to post for REB boards | 5/26 | Mark | |
eTraveler procedure for posting RGA
results | Complete TBD | Mark/Robert | Coordination with Mark Bostic at SLAC for posting RGA
results
|
...
Deliverable | Complete Date | Responsible | Blockers/Issues |
---|
Finish release of 0266 ICD | 4/27 | Mark | |
Finish release of Platform ICD | 4/20 | Mark | |
Finish release of Timing ICD | 5/4 | Mark | - Talk to Matt Weaver and Boyes on some scope still
floating around
|
Finish release of HPS FRSs | 5/11 | Mark | - Waiting for direction from E-beam Controls
|
Finish release of HPS ESDs | 5/11 | Mark | - Waiting for direction from E-beam Controls
|
...
Deliverable | Complete Date | Responsible | Blockers/issues |
---|
Summer intern - AIR Elx software library API docs, consider Doxygen | | | |
Review permissions scheme for ppareg Confluence space | | Mark | |
Reorg and new navigation scheme for ppareg Confluence spaec | | Mark | |
Run interference with LCLS, LCLS-II doc control and CDR/PDR/FDR and CD* review prep. | | Mark | |