Since the allocated beam time is not very much, we should exploit the capability of operating the CU with multiple trigger engines. This was demonstrated to work at CERN, we need to define more engines and test them.
Moreover, effects like pedestal drift and different investigations to be performed, suggest that we run in such mode to cover more topics in a short data-taking time.
Multiple trigger engines worked with the CU both at CERN-SPS and at INFN with CR tests.
SUch Such operation must will be verified prior to start with beam, and immediately when the beam is onagain at GSI, with CR and beam, to make sure that the CU operates in the expected way and we can proceed with the test in such mode.

The CNO trigger, in combination with TKR and CAL triggers will be the main trigger for the test. Some runs will be taken with external trigger, others will be taken with standard internal trigger made with TKR and CAL primitives. Please note that without external trigger we will have some contamination from CR.
A periodic trigger, with variable frequency, will be in parallel to the main particle trigger all the runs, in order to sample the hardware status with random triggers.
All these requestes are implemented through the specific multiple trigger engines defined below, each of which mapped to a specific BT configuration. Here is a list of the configurations used.
Any of the EXTERNAL, CNO, TKR, CAL-LO, CAL-HIGH, PERIODIC signal can open the trigger window.

List of runs

Below is a list of specific run requests. Plese update the table and notify Luca so that a proper run schedule can be developed and agreed with GSI

Purpose

preferred schedule

Ion

Energy

Rate on CU

Beam focus

CU configuration

Trigger

notes

reference

Test multiple trigger engines prior to beam

nov 16-17

NA

NA

NA

NA

enable multiple trigger engines

CNO, periodic, internal trigger

all BTs

change CNO take runs at different CNO thresholds, periodic trigger frequency

luca

Test multiple trigger engines w beam

nov 18

C

1.5Gev/n

100Hz

any

enable multiple trigger engines

CNO, periodic, internal trigger

all BTs

change take runs at different CNO thresholds, periodic trigger frequency

luca

Monitor beam rate and conditions

nov 18

C

1.5Gev/n

10-1000Hz

play with focus to change beam intensityon CU

4 range readout, non zero suppression

external

BT52, BT53

to be repeated shortly per configuration change

luca

Rate scan

after multiple engine work

C

1.5Gev/n

10-1000Hz

play with focus to change beam intensityon intensity on CU

multiple trigger engines

BT50, BT51, BT54 CNO, periodic, internal trigger

vary periodic trigger frequency to induce pedestal drift

luca, eric g

Tracking performance

nov 18 any time

C,Xe

1.5Gev/n

10-1000Hz

far and near focus

multiple trigger engines, flight settings, 4range-readout NZS

BT50, BT51, BT52 CNO, internal trigger

investigate tracking at different rates and angles (0,30,45,60 TBD), scan tower3 w/o ACD tile with ext trigger

leon, INFN

Tracking saturation

nov 18 any time

C,Xe

1.5Gev/n

10-1000Hz

far focus

multiple trigger engines, flight settings

CNO, TKR trigger, 4range-readout NZS

BT50, BT51

scan different angles (0,30,45,60 TBD), scan tower3 w/o ACD tile with ext trigger  

leon, INFN

CAL calibration

nov 18

C,Xe

500MeV 600MeV/n, 1GeV/n, 1.5GeV/n

100Hz

far and near focus

multiple trigger engines

CNO, periodic, internal trigger

BT50

verify quenching factors, CAL calibrations, ACD partial calibration

CAL team

CAL calibration comparison with previous results

nov 18

C,Xe

1.5GeV/n

100Hz

far and near focus

BT50, BT51

beam on tower1 to avoid TKR in the line

CAL team

Energy scan

nov 19

C,Xe

100MeV 600MeV/n - 1.5GeV/n in steps

10-1000Hz

far and near focus

multiple trigger engines

BT51 CNO, periodic, internal trigger

attempt to simulate different ions by varying ionization energy

nicola

Secondary ions with target

nov 19

Xe

1.5GeV/n

10-1000Hz

far and near focus

multiple trigger engines

CNO, periodic, internal trigger

BT50

attempt to get different ions by shooting beam through a target - need verification with GSI people

benoit

Charge injection in CAL with beam

nov 19

C

1.5GeV/n

10-1000Hz

far and near focus

BT50

check pedestal restoration with beam ON, explore different beam rates; can use existing CalibGenCAL script

sasha

Charge injection in TKR with beam

nov 19

C

1.5GeV/n

10-1000Hz

far and near focus

BT50

check rate effect in TKR signal; must identify CI script and plots to monitor

leon, TKR team

scintillation measurement in CDE

nov 19

C, Xe?

1.5GeV/n

100Hz

 

NA

place another detector upstream and monitor signal pulse

benoit