...
LSSTCAM charge numbers:16714-B2121, 10139 16713-B2019B2311
Other upcoming tasks/issues coordinated with Nadine Kurita for LSST Camera can be found here Camera Documentation Planning.
...
Deliverable | Complete Date | Responsible | Blockers/Issues |
---|---|---|---|
Write eTraveler assembly and test procedures for Camera Cryostat including refrigeration system. | 11/30/16 | Mark/Robert | |
4 |
| ||
| |||
| |||
| |||
|
Deliverable | Complete Date | Responsible | Blockers/Issues |
---|---|---|---|
With Walt Innes, plan assembly sequence and eTraveler procedures for ~500 commercial auxiliary electronics parts | Complete TBD | Robert | |
Write eTraveler procedures for inventory control of commercial auxiliary electronics parts | 6/15 | Mark/Robert | |
Write eTraveler procedures for testing of auxiliary electronics assemblies as needed (e.g. Camera protection system) | Complete TBD | Robert | |
Consult with SLAC Camera subsystems (Cryo, CBM, Shutter, I&T) on assembly sequences, scope and "load balancing" for writing eTraveler procedures | 6/15 | Mark/Robert | |
Plan for Camera operations & maintenance documentation, relationship to eTraveler | 7/15 | Mark/Robert |
|
...
Deliverable | Complete Date | Responsible | Blockers/Issues |
---|---|---|---|
| |||
Out for approval according to Matt | |||
Finish release of Timing ICD | 5/4 | Mark |
|
Finish release of HPS FRSs | 5/11 | Mark |
|
Finish release of HPS ESDs | 5/11 | Mark |
|
Charge numbers:
...
Deliverable | Complete Date | Responsible | Blockers/issues |
---|---|---|---|
Develop ePix100 "advanced user" doc for LCLS-II: full register documentation of readout system and ASICs; describe known detector edge cases behavior and configurations | TBD | Mark | |
ePix100A detector data sheet | 5/1113 | Mark |
|
ePix100A installation guide | 5/1113 | Mark |
|
ePix100A detector ops/api guide | 5/1113 | Mark |
|
...
Deliverable | Complete Date | Responsible | Blockers/issues |
---|---|---|---|
Review permissions scheme for ppareg Confluence space | Mark | ||
Reorg and new navigation scheme for ppareg Confluence spaec | Mark | ||
Run interference with LCLS, LCLS-II doc control and CDR/PDR/FDR and CD* review prep. | Mark |