This page documents the configuration during the 2024 Summer Shutdown.
Notes
This section contains notes on the cables between the NW side of target chamber and rack PR60.
- Standard Motor DB9 Cable #1
- Standard Motor DB9 Cable #2
- Standard Motor DB9 Cable #3
- Standard Motor DB9 Cable #4
- Standard Motor DB9 Cable #5
- Standard Motor DB9 Cable #6
Bottom Flanges
Flange | Feedthru | Destination |
---|
B1 | | |
B2 |
|
|
B3 |
|
|
B4 |
|
|
B5 |
|
|
B6 |
|
|
B7 |
|
|
B8 |
|
|
Door Flanges
Flange | Feedthru | Destination |
---|
D1a | | |
D1b |
|
|
D2a |
|
|
D2b |
|
|
D2c |
|
|
D2d |
|
|
D4a |
|
|
D4b |
|
|
D5a |
|
|
D5b |
|
|
D7a |
|
|
D7b |
|
|
D7c |
|
|
Over-the-Chamber Flanges
Flange | Feedthru | Destination |
---|
T4/(gamma) | | |
T5/(beta) |
|
|
T6/(alpha) |
|
|
T11/(delta) |
|
|