This page documents the configuration during the 2024 Summer Shutdown.

Notes

This section contains notes on the cables between the NW side of target chamber and rack PR60.

Bottom Flanges

FlangeFeedthruDestination
B1
  • a
  • dest a
B2

B3

B4

B5

B6

B7

B8


Door Flanges

FlangeFeedthruDestination
D1a
  • a
  • dest a
D1b

D2a

D2b

D2c

D2d

D4a

D4b

D5a

D5b

D7a

D7b

D7c


Over-the-Chamber Flanges

FlangeFeedthruDestination
T4(gamma)
  • a
  • dest a
T5(beta)

T6(alpha)

T11(delta)



  • No labels