Attendance:
Conny, Philip, Bhavna, Kaz, Alex, Zongde, Xavier, Julian, Nolan, Lorenzo, Bojan, Dionisio, Dawood
Presentations:
Agenda/Notes:
- ePixM:
- Beamtime prep, Status off:
- Getting the detector running in DAQ;
- Done. Data recorded.
- Getting the fibers installed at MFX and to server;
- Done.
- Make drawings.
- Physical setup to secure the camera;
- Chris Koerber has a solution. Today at 11am.
- Checking we have the multitosingle mode converter box;
- Yes, we have it.
- Cables and supplies to run the camera and what bias we need to apply
- We have all cables and power supplies.
- Bias = -50V. Keep an eye on current draw. (Installation today)
- Light shield to block visible light;
- Taped over the yellow kapton. Test with flashlight today.
- Evaluate the data coming out of the detector;
- Data recorded. No evcode283 yet, but waiting for beam. Matt Weaver is also checking to make sure it's in the datastream.
- Many hot pixels/columns.
- Testing the data analysis scripts and visualisations;
- Negative signal, pedestals ~>20000ADU
- 15bits data, 1 bit gain
- asic[0] and asic[3] are not bonded. Only look at asic[1] and [2]. (data is epixm[4][192][384])
- ami2 - filter in evcode 283.
- Testing the timing scan and trigger rate setting script;
- Timing scan tested....try again in mfx.
- Intensity scan should be ready (same as before).
- Setting up the pre-setup meeting (include TID);
- Done.
- Get the measurement list together;
View file name Beamtime ePixM Measurements Plan Apr 2024.xlsx height 250
- Schedule the staffing;
- Ensure we have the needed support;
- AMI-2
- Getting the detector running in DAQ;
- Beamtime prep, Status off:
- A.O.B.
- HV test at TID needs to be done to see what bias we want to run at.