Beginning October 31, 2024, login to Confluence and Jira will change. Read more.
This page is outdated. Talk to Pelle for information about this.
To be sure you are getting the latest specification: ask Pelle.
Specifications
- Low voltage: DB44 termination of each pigtail (total of 5) from flange board to the patch panel inside the chamber: excel file
- High voltage: REDEL termination of each pigtail from flange board to the patch panel: excel file
- For cable inside the chamber the final termination should use the "NEW" column
Power and HV cables specification
{"serverDuration": 49, "requestCorrelationId": "2fadb34d4238ecf1"}