Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 4.0

 Day

Hour

Shift

People

 On call expert

Program

 th 27

18-24 

 swing

Luca B, Gloria 

 

beam tuning, e trigger setup, define CU config for CAL calib runs

 fr 28

00-06 

 owl

 Johan, Eduardo

 

CAL calib runs

 fr 28

06-12

 morning

 Carmelo, Thierry, Fred

 

CAL calib runs

 fr 28

12-18

 day

 Ric, Luca L

 

DAQ sync

 fr 28

18-24

 swing

 Johan, Gary

 

beam studies, CJU timing

sa 29

00-06

 owl

 Luca B, Alex

 

ACD calib runs, CAL calib runs

sa 29

06-12

 morning

 Carmelo, Sandro

 

NO BEAM since 7.45

sa 29 

12-18

 day

 Johan, Ronaldo

 

NO BEAM


 

 

   NO BEAM UP TO mo 31

  

NO BEAM until monday 31 for power failure

mo 31

8-16

day

Carmelo, Gary, Benoit

  e runs at an angle, e beam scan (3,2,1 gev)


mo 31 

16-24

swing

Luca B, Sandro, Gloria, Nicola M

  photon

NO BEAM trigger studies, tagger calibrations

tu 1

00-08

owl

Johan, Alex, Gilles, Fabio Philippe

  tagger calibrations, photon runs

scan of cal cracks

tu 1

8-16

day

Carmelo, Thierry, Monica, Erik

 

 

tu 1 

16-24

swing

Ric, Nicola O, Francesco, Luca L

 

 

we 2 

00-08

owl

Luca B, Tomi, Philippe

 

 

we 2

8-16

day

Carmelo, Claudia, Gilles, Gary

 

 

we 2 

16-24

swing

Luca B, Gloria, Leon, Luca L

 

 

th 3 

00-8

owl

Ric, Alex, Eduardo, Thierry

 

 beam stops at 4AM for PS intervention

 

 

 

 

 

 

pion run for cross-check, 





 

NO BEAM until august 8 for PS injection septum replacement