Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Practice Session Nov. 8, 2023

With rix scientists.  Executive Executive summary of starting plan:  we we will run continuous sequences for all running (free running and scans).  At the start all the andors will run at the same rate at either 1,10,100Hz in some appropriate combination of FVB,crop,full-frame mode.

...

To view status of the 4 sequence engines (4 eventcodes per engine) execute "xpmpva DAQ:NEH:XPM:3" and select the "Groups/Eventcodes" tab:Image Removed.  The "Master" column is important: it says which XPM controls which event code (in units of an "engine": 4 event codes).  The "Ena" and "Dis" buttons (for the appropriate XPM!) can be used to change which XPM controls a particular engine.

Image Added

Kristjan's tables of andor rates/readout times:

View file
nameAndor_burst_modes_8Nov23.pdf
height250

Practice Session April 3, 2024

Commands for 66Hz Andor running with 8kHz beam:

Code Block
8kHz beam + one camera (66Hz): rixgenerator --bunch_period 112 --periods 0.015385 --readout_time 0.005
8kHz beam + two cameras(1Hz + 66Hz): rixgenerator --bunch_period 112 --periods 1 0.015385