...
- LV and HV for module
- Power relay
- flow control on CO2 tower
Detailed logic for DCS and Interlock are in the checklist
Confluence will be unusable 23-July-2024 at 06:00 due to a Crowd upgrade.
...
Detailed logic for DCS and Interlock are in the checklist