Reagan, Brendan 

Hill, Elizabeth 

Alex Wallace 

Robert Plummer

Space Allocation - Cavern Size

TopicsNotes
Cavern SizeLaser Rooms

MM - : Would like to include all possible equipment in model.  BW: Beware of assuming large sizes due to low maturity level of some designs.  EH: base Amica + footprint is going to be a little larger.  Space needed for ++ is going to be significantly larger.  MM: Need to look at conceptual volume of how much space needed for multi kJ upgrade.  SY: Need to take another look at trombone.  MM:  Need to consider stacking components as well as larger cavern.  TS:  Concerned with dump (1-2 week timeframe) and compressing/shrinking (3-4 week timeframe).  MM:  Tom, Kai, Steven, Corey, Bill to discuss beam dump.  Steven to coordinate meeting for next week after discussing with Tom.  MM: Consider alternate dump location/position (e.g. within beam pipe?). MM: Revisit orientation/configuration of RR laser?  Are assumptions still correct?  Tom will revisit and be ready for discussion in a week.

TAXCH:  Biggest concerns are equivalent plan diagnostic, Visar (extent that is on vs. off project).  MM:  Need discussion with E. Cunningham and E. Galtier, Bill White, Corey.  CH:  Supporting infrastructure is also a big concern (e.g. tables, storage, gas bottles, chillers).  Bahram is working on including auxiliary equipment.
ControlsCH:  Controls has submitted all requests, but placement currently on hold with cavern size changes.  Corey will revisit.  Controls contact for racks is Mitchell Cabral.
Conventional FacilitiesCH:  Circulatory system in model.  Few outstanding big problems – largest is air returns in RR Laser Hall.  TAX and Mezzanine air returns are problematic also.  Walls are moving in on technical systems.  Final designs will be designed by another vendor.  GD:  We should include spatial constraints in DGPS - drawings and specifications.  Need to follow up on how to include in DGPS.  TS:  Air handler?
InstallationCH:  Compressor - will need to be transported to space during co-occupancy, so cleanliness requirements may not be compatible with concrete pour.  TS:  Is space compatible with bringing in Amica?  CH:  Maintaining stay-clear aisle even if brought in as one piece.
Next StepsCH:  Brice is pushing on model.  Discussion on Monday.