Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Date

01

Attendees

Goals

  • Set and status planning activities for detector development and deployment.

Discussion items

TimeItemWhoNotes
30 minDeployment 2-wk planKPPlans to support upcoming experiments (in-work, mapping detectors to experiments in new R18 schedule)
30 minStatusAll
  • Group priorities review:
    • Detectors for Run 18
      • Jungfrau commissioning plan and commissioning tests (meet with Meng)
      • ePix10k2M (new) commissioning/calibration along same lines as JF
      • ePix10k2M (old) metrology and test to match
      • ePix smalls tests to match

    • Detectors under development
      • RIXS-CCD Project Plan
      • RIXS-CCD Concept Design (meet w/STA for power estimate, sitrling experience?)
      • Anton project at UCB/SSL
      • SXR Downselect prep

    • Lab 'commissioning'
      • Marietta certification
      • Mini-X certification
      • Kimball certification
      • DAQ
        • Storage nodes
        • LCLS I/II compatibility
      • Table seismic
      • Laser table re-cert


Actions:

    • check with TID about status of small epix100/10ka. (Mark)
    • check what cables we need for the in-vac epix100 setup in MEC and CXI. (Philip)
    • attach burst valve to egun, (maybe) rotate turbo, and do vacuum test over several days (Conny/Rebecca)
    • Laser recertification (Kaz)
    • Wave8-V2 tests (Kaz)
    • RIXS system pumpdown and vibration measurement (Conny/Rebecca)



Other news:

  • B84/B33 JSAs
somewhere in TID approval cycle
  • approved.
  • ePix Quads FDR
Thursday 4pm
  • completed,
website live
  • passed.
  • ICD review with NEH 2.2 2
1pm
  • :30pm today.
  • Framing Camera whitepaper
submitted to FES yesterday
  • acknowledged by Kramer, no review yet.
  • Stress-test test of JF @CXI complete.
  • ePix10k2M calibration/communication
status. Escalate?Jungfrau 4M calibration/commissioning plan
  • progress continues, no escalation presently necessary.


  • Priorities:
  • JF
Stress test
  • commissioning tests.
  • ePix10k setup, calibration.
  • RIXS-CCD project plan/concept design
  • Calibrations/procedure developments for detector deployments, starting with ePix.
  • Wave8 readiness.
  • BIO for racks in chase.
  • Seismic table mount components received
.
  • Status:
  • RA: Interns start tomorrow
    • Mtg. re eGun tmrw.
PH: ePix/JF analysis database issues...broke LCLS-I analysis
  • Calibration discussions w/ CH.
  • ePix10k need mtg w/JT
    KN:
    • Chiller ran through weekend no issues.
    • Want to try solution on other failed chiller
    • DAQ being brought down for upgrade. DAQ IoC doesn't seem to be cNeed to get Mike and Dan talking to the JF kit...IoC on top of PSI script
    • eGun installed in Marietta....need to buy HiCube 80.
  • KP:
    • Working procedures/calibration with Philip.
    • Working docs with Silke for online access.
  • 5 min
    Budget Updatemmck
    • M&S Status (Through DecemberMay)

    Image AddedImage Removed

    • Labor snapshot (DecMay. actuals):
      Image RemovedImage Added

    15 minReview ASC First Projectsall

    Coordinate/update lab schedule.

    10 minAny other business  

    Action items

    •  ActionKazutaka Nakahara to circulate and/or post chiller manual to confluence.
    •  ActionKazutaka Nakahara to run chiller over weekend to check stability, IOC performance.
    •  Action:  Group to review ePix cal/comm status on Monday’s call and need for escalation.
    •  ActionConny Hansson to look through Philip’s checklists to refine a written JF commissioning plan.
    •  ActionZimmerman, Kayla to provide update on the e-gun/RP JSA approval status.
    •  ActionZimmerman, Kayla to write up a draft epix10k deployment JSA, based on step-by-step.
    •  Action:  Rebecca to rough out Concept Design for June 26 review.