JIRA Items
LSSTCAM
Jira |
---|
server | SLAC National Accelerator Laboratory |
---|
columns | key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution |
---|
maximumIssues | 20 |
---|
jqlQuery | project="LCAI" and (assignee=marndt or assignee=robertdp) and status!="Closed" order by assignee |
---|
serverId | 1b8dc293-975d-3f2d-b988-18fd9aec1546 |
---|
|
Other Items
Jira |
---|
server | SLAC National Accelerator Laboratory |
---|
columns | key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution |
---|
maximumIssues | 20 |
---|
jqlQuery | project!="LCAI" and (assignee=marndt or assignee=robertdp) and status!="Closed" order by assignee |
---|
serverId | 1b8dc293-975d-3f2d-b988-18fd9aec1546 |
---|
|
LSST Camera (1.8 FTE)
LSSTCAM charge numbers:16714-B2121, 10139 16713-B2019B2311
Other upcoming tasks/issues coordinated with Nadine Kurita for LSST Camera can be found here Camera Documentation Planning.
...
Deliverable | Complete Date | Responsible | Blockers/Issues |
---|
Write eTraveler assembly and test procedures for Camera Cryostat including refrigeration system. | 11/30/16 | Mark/Robert | |
eTraveler standards, conventions,
best practices documentation. All Camera
subsystems must use. | 45/2716/1516 | Mark/Robert | Consensus from Camera project on core standards
| Standards complete, project to announce and socialize.
|
Write eTraveler procedures for CR wavefront sensor receipt, verification and shipment to SLAC | 6/10/16 | Mark | Input from Camera QA
|
eTraveler procedure for mechanical
assembly of raft electronics boards
(attach coldbars and FPGA heat sink) | Done 5/4/16
| Robert | |
eTraveler procedure for raft electronics
board initial testing (bring up board and
load firmware. Prep for TS-REB testing) | Complete 5/23
| Robert | |
Meet with Camera on what RGA snapshots to post for REB boards | 5/26 | Mark | |
eTraveler procedure for posting RGA
results | Complete TBD | Mark/Robert | eTraveler procedures for raft electronics boards | ??? (~5 days effort left, waiting on BNL) | Robert | Final assembly process details from BNL | Coordination with Mark Bostic at SLAC for posting RGA
results
|
Medium/long term projects/deliverables
Deliverable | Complete Date | Responsible | Blockers/Issues |
---|
Write demo eTraveler procedures to show Walt Innes
how eTraveler can be used to monitor and control
auxiliary electronics inventory | Done 4/20/16 | Robert | |
With Walt Innes, plan assembly sequence and eTraveler procedures for ~500 commercial electronic auxiliary electronics parts | 5/15 Complete TBD (Ongoing) | Robert | |
Write eTraveler procedures for commercial elx inventory control of commercial auxiliary electronics parts | 6/15 | Mark/Robert | |
Write eTraveler procedures for testing of auxiliary electronics assemblies as needed (e.g. Camera protection system) | Complete TBD | RobertRobert/Mark | |
Consult with SLAC Camera subsystems (Cryo, CBM, Shutter, I&T) on assembly sequences, scope and "load balancing" for writing eTraveler procedures | 6/15 | Mark/Robert | |
Plan for Camera operations & maintenance documentation, relationship to eTraveler | 7/15 | Mark/Robert | - Project decision on how suitable eT is
for operations and maintenance
|
...
Deliverable | Complete Date | Responsible | Blockers/Issues |
---|
Finish release of 0266 ICD | 4/27 | Mark | - Matt Boyes back 4/18. He will guide the doc out.
Out for signoff (still)
|
Finish release of Platform ICD | 4/20 | Mark | Out for approval according to Matt |
Finish release of Timing ICD | 5/4 | Mark | - Talk to Matt Weaver and Boyes on some scope still
floating around
|
Finish release of HPS FRSs | 5/11 | Mark | - Get blessing from Matt Boyes on outline/contentsWaiting for direction from E-beam Controls
|
Finish release of HPS ESDs | 5/11 | Mark | - Get blessing from Matt Boyes on outline/contentsWaiting for direction from E-beam Controls
|
ePix (0.1 FTE)
Charge numbers:
...
Deliverable | Complete Date | Responsible | Blockers/issues |
---|
Develop ePix100 "advanced user" doc for LCLS-II: full register documentation of readout system and ASICs; describe known detector edge cases behavior and configurations | TBD | Mark | |
ePix100A detector data sheet | 5/1113 | Mark | - Done, needs only proofread before sending out
|
ePix100A installation guide | 5/1113 | Mark | - Done, needs only proofread before sending out
|
ePix100A detector ops/api guide | 5/1113 | Mark | - Need to know if assembled detector can/will be
pre-calibrated (ASIC calibration) and a config database deliveredWaiting for some sections from Gabriel on calibration use cases
|
TID-AIR General Work (??? FTE)
...
Deliverable | Complete Date | Responsible | Blockers/issues |
---|
Summer intern - AIR Elx software library API docs, consider Doxygen | | | |
Review permissions scheme for ppareg Confluence space | | Mark | |
Reorg and new navigation scheme for ppareg Confluence spaec | | Mark | |
Run interference with LCLS, LCLS-II doc control and CDR/PDR/FDR and CD* review prep. | | Mark | |