Note a conflicting procedure / documentation in the procedures folder: 9.8.3 Pumping/Venting Procedure . These are being reconciled.

Readiness

Primary vacuum

...

checklist

  •  All chamber doors must be closed
  •  All chamber flanges must be in place (no obvious opening)
  •  TC1:VGC:11, TC1:VGC:12, TC1-VGC-01, TC1-VGC-02, TC1-VGC-03, TC1-VGC-04 must be closed
  •  MEZ-PMF-01 EBARA A70, MEZ-PMF-02 EBARA A70 must be off (if faulted, press RESET)
  •  TC1-VGC-04, MEZ:VGC:17, MEZ:VGC:18, MEZ-VIC-19 must be closed
  •  MEZ-GPI-02 must display ~ 6.5e+02 torr (if lower, open MEZ:VGC:18 until restored, then close)
  •  TC1-VGC-04, MEZ:VGC:17, MEZ:VGC:18, MEZ-VIC-19 must be closed and allowed to open

Turbo pump startup procedure

  •  Open mechome, go the tab "User Devices", open the panel "User Sentry PDU"
  •  Turn On "Roughing pump PTM 02 (turbo 2)"
    - after a while, scroll to turbo gate-valve (SEW-VGC-15) will switch to allowed to open.
  •  Press OPN on SEW-VGC-15
    - turbo status goes to "OK to Run"
  •  Press RUN next to the turbo pump logo
    - turbo status will go through "Accelerating" then "Full Speed" mode

The turbo pump subsystem is now ready for operation.

  •  The gas ballast control knob of the scroll pump should be set to level 0
  •  Turbo pump should be at "Full Speed" (if not follow Turbo pump startup procedurebelow)

Pumpdown

...

procedure

  •  Press OPN on TC1-VGC-04
  •  Press RUN on MEZ-PMF-01 EBARA A70
  •  Press OPN on MEZ:VGC:17 (wait a few seconds if MEZ:VGC:17 cannot open)
  •  Press RUN on MEZ-PMF-02 EBARA A70
  •  Press OPN on MEZ-VIC-19 (wait a few seconds if MEZ-VIC-19 cannot open)

...

  •  Wait until MEC:TC1:GPI:01

...

  • drops below 5.0e-02 torr
  •  Press OPN on TC1-VGC-02
  •  Press CLS on MEZ:VGC:17
  •  Press STP on MEZ-PMF-01 EBARA A70
  •  Press CLS on MEZ-VIC-19
  •  Press STP on MEZ-PMF-02 EBARA A70
  •  Press OPN on MEZ:VGC:18
  •  Wait until MEZ-GPI-02 passes above ~ 6.5e+02 torr
  •  Press CLS on MEZ:VGC:18

(typically after 30-40 minutes from startup).If something goes off track during this procedure, initiate the venting procedure and check for leaks (flanges, virtual leaks, waterlines, etc).

...

Prerequisites

Turbo pump

...

startup

  •  Open mechome, go to the tab "User Devices", open the panel "User Sentry PDU"
  •  Turn On "Roughing pump PTM 02 (turbo 2)"
  •  Wait until SEW:GPI:04 drops below 1.0e-02 torr
  •  Press OPN on SEW-VGC-15
  •  Press RUN next to the turbo pump logo
  •  Wait until turbo pump displays "Full Speed"

Version tracking

VersionRelease dateDescription
v1.00

 

Demonstration version
v1.01

 

Simplification of the procedure using only checklists

Secondary vacuum pumping procedure

  • Press OPN on TC1-VGC-02
    - primary vacuum gate-valve will automatically close first, before turbo gate-valve opens → do not forget the primary vacuum shutdown procedure below
    - target chamber Pirani gauge value should plummet, until it goes out of range and the target chamber cold-cathode gauge takes turn
  • Press STP on both Ebara pumps
  • Press CLS on MEZ:VGC:17 and MEZ-VIC-19
  • Press OPN on MEZ:VGC:18
    - primary vacuum line will start venting
    - wait until Pirani gauge MEZ-GPI-02 goes above ~ 6.5e+02 torr
  • Press CLS on MEZ:VGC:18
    - primary vacuum venting valve should not stay open longer than ~ 5 minutes as it may heat up too much

...