Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Start QNAP NAS (in S20 gallery) and ask Ken/Jeremy to mount it on all facet computers (facet-srv20, cpu-liXX-pmXX)
  • Test DAQ
  • Check pico motor servers are running
  • Check state of flippers. They might have gone to an unsafe state.
  • Home UPX stages. Do this only for stages you know are safe to move.
  • Test transmission through IP with alignment laser. The oven mover, actuators with foils or wire scanners may be in an undefined state.Check if pico motor controllers are running.


Things to check:3/2/24 outageSystem owner:Notes:




Oven mover is in bypass position


Doug S.Required to clear MPS fault.
Retract the DS Be window 
Doug S. / Ivan
PB, spectrometer, and laser transport turbos on
Doug S. / Ivan
When LCW is off: Ensure beamline valves inserted, DPS turbos and roughing pumps are OFF.
Doug S.

When LCW is back on: DPS pumps restarted (US and DS turbos and roughing pumps).

  • VV 3172 retracted when vacuum is stable.

Ops / Doug S.DS Be window should be retracted first
DPS Vacuum watcher restarted
Ops / Doug S.
Spectrometer Camera Checkout Procedure
Doug S.
IP flippers are checked and are in a safe state


Motor reinitialisation: Most motors are homed, a few are postponed to next PAMM (see: here)


Alignment laser can transmit through IP into IPTOR1. IPOTR2 → Camera problems, DSOTR→ Motor issues (catered)