Date
Topics
Excerpt |
---|
|
Discussion Items
- Collect walk-ins
- Notes review
- Name proposal
- "The collective" ack. Barry
- LLE Visit planning
- Topics/ discussion requests for LLNL?
- Follow up with Jessica Jimenez if anything comes to mind.
- Alex will not be on site on the 22nd, but will be onsite on the 23rd.
- Collaboration Meeting Coordination
- Topics/ discussion requests for LLNL?
- ICD Discussion
- Robert planning to have a discussion about ICD in general with others, what will the format ultimately be.
- Alex will proceed with preparing the preliminary release for everyone's consideration.
- Next steps in requirements development
- Review conops for all parts of the collective, identify all signals and diagnostics that must and would be nice to include in the DAQ stream
- Consider:
- What kind of diagnostic data is required for the science mission and the operations needs?
- Need to determine space and rate constraints of the SLAC EPICS archiver system
- Working on it
- How the diagnostic data will be used in the science goals of the facility?
- This determines what really needs to be included in the DAQ and how synchronously it must be acquired.
- How the diagnostic data will be used in optimizing and maintaining laser system performance
- Could the DAQ system be leveraged be used in this regard if the EPICS archiver won't be enough? Jana B. Thayer
- This information will help to define our control system infrastructure requirements
- Consider:
- Controls hardware volume and cable tray estimates
- Need to develop high-level estimates for all systems in the collective as the cavern dimensions and floorplans are being set right now.
- Review conops for all parts of the collective, identify all signals and diagnostics that must and would be nice to include in the DAQ stream
- Requirements lists
- Debuted the new requirements list portal for Jama requirements capture
- This portal is being used by SLAC to capture requirements before they are programmed into Jama
Action items
- Follow up with LLE and LLNL AHJ to connect with SLAC EEIP to hopefully get Ch8 requirements satisfied by local authorities, avoid having to redo EEIP upon arrival at SLAC.
Develop the ICD approver list, send out the preliminary draft to the collective for consideration Alex Wallace
Past meeting AI
Task report | ||
---|---|---|
|