******* June 5th, Thursday, update from Stepan

Dear all,

I am happy to inform that HPS chicane magnets are now installed in the 
Hall-B downstream alcove.
Many thanks to the Hall-B engineering-technical team for the excellent 
work. Great work!

Best, Stepan

Chicane magnets installed 5 June 14.JPG


*******June 4th, Wednesday, update from Stepan "Spectrometer magnet installed"

Analyzing magnet installed 4 June 14.JPG


********June 4th, Wednesday, update from Stepan "Load test of the spectrometer magnet support - magnet will be installed today."

load_test-1.jpg

load_test-2.jpg

load_test-3.jpg

 

******** June 3rd, Tuesday, update from Stepan "First Magnet Installed"

Frascati magnet installed.JPG



Agenda: 

- Beamline update - FX (see photos below shown at last Wednesday's meeting)

Installation photos of Frascati magnets and alcove 

 

IMAG0037.jpg

 

IMAG0035.jpg

 

IMAG0034.jpg


- Installation and Survey Homework - John (see attachment of draft)

 Draft SVT Installation.pptx


- ASAD Draft - Stepan

ESAD_HallB-HPS-1.pdf

ECal Installation and Survey - Raphael

...

***************************************************************

 

Installation photos of Frascati magnets, alcove and magnet going into alcove

 

 Image Removed

- Other?