Note a conflicting procedure / documentation in the procedures folder: 9.8.3 Pumping/Venting
...
Prerequisites
- If ending operation with the x-ray beamline, make sure that the pulse picker is closed, stopper S6 is inserted, hutch search is broken and glass window inserted.
- Stand next to the chamber during the procedure to be ready to react once the chamber is vented and avoid over-pressurization.
Venting procedure
...
Procedure . These are being reconciled.
Readiness checklist
- All chamber doors must be closed
- All chamber flanges must be in place (no obvious opening)
- TC1:VGC:11, TC1:VGC:12, TC1-VGC-01, TC1-VGC-02, TC1-VGC-03, TC1-VGC-04
...
- must be closed
- MEZ-PMF-01 EBARA A70, MEZ-PMF-02 EBARA A70 must be off (if faulted, press RESET)
- TC1-VGC-04, MEZ:VGC:17, MEZ:VGC:18, MEZ-VIC-19 must be closed
- MEZ-GPI-02 must display ~ 6.5e+02 torr (if lower, open MEZ:VGC:18 until restored, then close)
- TC1-VGC-04, MEZ:VGC:17, MEZ:VGC:18, MEZ-VIC-19 must be closed and allowed to open
- The gas ballast control knob of the scroll pump should be set to level 0
- Turbo pump should be at "Full Speed" (if not follow Turbo pump startup procedurebelow)
Pumpdown procedure
- Press OPN on TC1-VGC-04
- Press RUN on MEZ-PMF-01 EBARA A70
- Press OPN on MEZ:VGC:17 (wait a few seconds if MEZ:VGC:17 cannot open)
- Press RUN on MEZ-PMF-02 EBARA A70
- Press OPN on MEZ-VIC-19 (wait a few seconds if MEZ-VIC-19 cannot open)
- Wait until MEC:TC1:GPI:01 drops below 5.0e-02 torr
- Press OPN on TC1-VGC-02
- Press CLS on MEZ:VGC:17
- Press STP on MEZ-PMF-01 EBARA A70
- Press CLS on MEZ-VIC-19
- Press STP on MEZ-PMF-02 EBARA A70
- Press OPN on MEZ:VGC:18
- Wait until MEZ-GPI-02 passes above ~ 6.5e+02 torr
- Press CLS on MEZ:VGC:18
If something goes off track during this procedure, initiate the venting procedure and check for leaks (flanges, virtual leaks, waterlines, etc).
Turbo pump startup
- Open mechome, go to the tab "User Devices", open the panel "User Sentry PDU"
- Turn On "Roughing pump PTM 02 (turbo 2)"
- Wait until SEW:GPI:04 drops below 1.0e-02 torr
- Press OPN on SEW-VGC-15
- Press RUN next to the turbo pump logo
- Wait until turbo pump displays "Full Speed"
Version tracking
Version | Release date | Description |
---|---|---|
v1.00 |
| Demonstration version |
v1.01 |
| Simplification of the procedure using only checklists |
Turbo pump shutdown
It is not mandatory to shutdown the turbo pump during each venting cycle. We usually let it run when venting for a short time during a shift. If venting for a longer time between two shifts, we usually turn off the turbo pump but not its rouging. The following steps describe a full shutdown of the turbo line after venting.
- Press STP next to the turbo pump logo
- let the turbo spin down for at least 15-20 minutes (the off-status logo on the turbo does not mean the blades have stopped spinning)
- stop at this step if you will restart the turbo in less than a day, additionally you can set the scroll ballast to level I (it can be set to level 0 or I during operation) - Press CLS on SEW-VGC-15
- make sure ballast level is set to 0 before going to the next step - Open mechome
- Go the tab "User Devices"
- Open the panel "User Sentry PDU"
- Turn Off "Roughing pump PTM 02 (turbo 2)"
List of PVs associated to the vacuum system components
Pumps
...
Gate-valves
...
Logical permissions on the gate-valves
...
Pressure gauges
PV | Function | |
---|---|---|
MEC:TC1:GMP:01:PRESS | Target chamber capacitance gauge (out of order) | |
MEC:TC1:GPI:01:PMON | Target chamber Pirani gauge | |
MEC:TC1:GCC:01:PMON | Target chamber cold-cathode gauge | |
MEC:MEZ:GPI:02:PMON | Primary vacuum line Pirani gauge | |
MEC:MEZ:GPI:06:PMON | Ebara pump 1 inlet Pirani gauge | |
MEC:MEZ:GPI:07:PMON | Ebara pump 2 inlet Pirani gauge | |
MEC:SEW:GPI:04:PMON | Scroll (turbo 2) pump inlet Pirani gauge||