LSSTCAM charge numbers:16714-B2121, 10139 16713-B2019B2311
Other upcoming tasks/issues coordinated with Nadine Kurita for LSST Camera can be found here Camera Documentation Planning.
...
Deliverable | Complete Date | Responsible | Blockers/Issues | |||
---|---|---|---|---|---|---|
Write eTraveler assembly and test procedures for Camera Cryostat including refrigeration system. | 11/30/16 | Mark/Robert | ||||
4 |
| |||||
| ||||||
| ||||||
| ||||||
??? | Robert | Final assembly process details from BNL |
|
Deliverable | Complete Date | Responsible | Blockers/Issues | ||||
---|---|---|---|---|---|---|---|
With Walt Innes, plan assembly sequence and eTraveler procedure authoring for ~500 commercial parts | 5/15 | Robert | procedures for ~500 commercial auxiliary electronics parts | Complete TBD | Robert | ||
Write eTraveler procedures for inventory control of commercial auxiliary electronics parts | 6/15 | Mark/Robert | |||||
Write eTraveler procedures for testing of auxiliary electronics assemblies as needed (e.g. Camera protection system) | Complete TBD | Robert | |||||
Consult with SLAC Camera subsystems on (Cryo, CBM, Shutter, I&T) on assembly sequences, scope and "load balancing" of for writing eTraveler procedure authoringprocedures | 6/15 | Mark/Robert | |||||
Plan for Camera operations & maintenance documentation, relationship to eTraveler | 7/15 | Mark/Robert |
|
...
Deliverable | Complete Date | Responsible |
---|---|---|
3 monthly reports | Monthly 15th, 31st | Robert |
Camera subsystem FDR, MRR site and document prep | Roughly monthly | Mark |
Camera document control: doc mgmt, prep, routing, release | (As needed, currently 4-10 hours per week) | Mark |
...
Deliverable | Complete Date | Responsible | Blockers/Issues |
---|---|---|---|
| |||
Out for approval according to Matt | |||
Finish release of Timing ICD | 5/4/20 | Mark |
|
Finish release of HPS FRSs | 45/2711 | Mark |
|
Finish release of HPS ESDs | 5/11 | Mark |
|
Charge numbers:
...
Deliverable | Complete Date | Responsible | Blockers/issues | |
---|---|---|---|---|
Develop ePix100 "advanced user" doc for LCLS-II: full register documentation of readout system and ASICs; describe known detector edge cases behavior and configurations | TBD | Mark | ||
ePix100A detector data sheet | 5/1113 | Arndt | Mark |
|
ePix100A installation guide | 5/1113 | Arndt | Mark |
|
ePix100A detector ops/api guide | 5/1113 | Mark |
|
Most of these are wish listy items with no time or budget.
Deliverable | Complete Date | Responsible | Blockers/issues | ||
---|---|---|---|---|---|
Review permissions scheme for ppareg Confluence space | Mark | ||||
Reorg and new navigation scheme for ppareg Confluence spaec | Mark | ||||
Run interference with LCLS, LCLS-II doc control and CDR/PDR/FDR and CD* review prep. | Mark | Arndt | Need to know if assembled detector can/will be pre-calibrated (ASIC calibration) and a config database delivered |