The CNO trigger, in combination with TKR and CAL triggers will be the main trigger for the test. Some runs will be taken with external trigger, others will be taken with standard internal trigger made with TKR and CAL primitives. Please note that without external trigger we will have some contamination from CR.
A periodic trigger, with variable frequency, will be in parallel to the main particle trigger all the runs, in order to sample the hardware status with random triggers.
All these requestes are implemented through the specific multiple trigger engines defined below, each of which mapped to a specific BT configuration. Here is a list of the configurations used.
Any of the EXTERNAL, CNO, TKR, CAL-LO, CAL-HIGH, PERIODIC signal can open the trigger window.
Name | summary |
---|---|
BT50 | flight-like CNO but NZS + periodic 5Hz |
Condition | engine |
CNO&&TKR&&ANY-CAL | 4-range, NZS |
periodic(5Hz) | 4-range, NZS |
TKR only | inhibit (no readout) |
Name | summary |
---|---|
BT51 | flight-like CNO + periodic 5Hz |
Condition | engine |
CNO&&TKR&&ANY-CAL | 4-range, ZS |
periodic(5Hz) | 4-range, NZS |
TKR only | inhibit (no readout) |
Name | summary |
---|---|
BT52 | external trigger, NZS, periodic 5Hz |
Condition | engine |
EXTERNAL | 4-range, NZS |
periodic(5Hz) | 4-range, NZS |
Name | summary |
---|---|
BT53 | external trigger, ZS, periodic 5Hz |
Condition | engine |
EXTERNAL | 4-range, ZS |
periodic(5Hz) | 4-range, NZS |
Name | summary |
---|---|
BT54 | external trigger, NZS, periodic high rate |
Condition | engine |
EXTERNAL | 4-range, NZS |
periodic(100Hz) | 4-range, NZS |
Name | summary |
---|---|
BT56 | like BT51, with no cno |
Condition | engine |
TKR&&ANY-CAL | 4-range, NZS |
periodic(5Hz) | 4-range, NZS |
TKR only | inhibit (no readout) |
...
Name
...
summary
...
BT57
...
like BT52, with no cno
...
Condition
...
engine
...
TKR&&ANY-CAL
...
4-range, ZS
...
periodic(5Hz)
...
4-range, NZS
...
TKR only
...
List of runs