...
YARR document: https://yarr.web.cern.ch/yarr/install/
- if the yarr PC updated, it might change the driver. In that case you need to reinstall the driver
QC tools
itkdb v0.4.12
...
Changed interlock to work with dewpoint instead of RH need to validate that this is okay.
Testing Procedure
- Checking the condition of the shipping and fill
- Visual inspection [take off the plastic cover for the module to have a clear photo]
- 1 overview photo and photos for each chip
- Start dcs interlock Pi
- ssh pi@dcs-...
- cd ~/imagin
- python runAllInterlocks.py
- Start 19v power to Pi
- Check that dummy light turns on.
- Start grafana
- Turn Air
- Load Load module and connect power and data lines
- For triplets turn on vacuum switch on front face of box.
- Turn on vacuum (the vacuum might have a problem when the sealing is bad between tube and the vacuum chuck)
- two thing you can do is to change the sealing
- change the requirement of the sealing (vacuum require) in the book)
- Close box and check that dew point is lowering.
- turn on the chiller
- turn on the pieltier (2.5V 1.2A)
- power the module:
- I: 5.5A V:~2V
- IV scan: use module-qc-tool
- Electrical Test:
- run data transmission check first:
- python3 scripts/update_config.py -c connectivity file
- /bin/eyeDiagram -r configs/controller/specCfg-rd53b-4x4.json -c <connectivity_file>
- scan_all.py to run all the electrical test
- need to change the module and testing date
- run data transmission check first: