Connection Details
Connection details should include:
- Target chamber flange/feedthru
- Controller ID and specific interface, e.g. card, port,...
- Digi/moxa name and port (if used)
- IOC
- From IOC we will determine server and then rack location
- Connection to server, e.g. ethernet, usb3, etc.
Note from Dimitri (27 March 2024):
For records (and maybe consistency):
- Our detector Q3 is connected in place of quad1 on the PDU and pgp card, alias in the daq is also Epix10kaQuad1.
- epix100_0 for XPCS is connected in place of epix3 on the PDU and pgp card, alias in the daq is still epix100a_0_xpcs because we did not want to mess up with the scripts.
Motor Checklist
Purpose | Base PV | Connection | pmgr | python device | Cabled? | Homed? |
---|
East_X | MEC:PPL:MMN:17 |
T5/*1, |
XPS 3/ |
1, ioc-mec-ppl-xps3 | Newport | east_x | Yes | Yes |
East_Y | MEC:PPL:MMN:18 |
T5/*2, |
XPS 3/ |
2, ioc-mec-ppl-xps3 | Newport | east_y | Yes | Yes |
East_Z | MEC:PPL:MMN:19 | T5/*3, XPS 3/3, |
ioc-mec-ppl-xps3 | Newport | east_z | Yes | Yes |
West_X | MEC:PPL:MMN:20 | T5/*4, XPS 3/4, |
ioc-mec-ppl-xps3 | Newport | west_x | Yes | Yes |
West_Y | MEC:PPL:MMN:21 | T5/*5, XPS 3/5, |
ioc-mec-ppl-xps3 | Newport | west_y | Yes | Yes |
West_Z | MEC:PPL:MMN:22 | T5/*6, XPS 3/ |
6, ioc-mec-ppl-xps3 | Newport | west_z | Yes | Yes |
VISAR_X | MEC:PPL:MMN: |
32 | VacCable 9, T6/DB25-1, AirCable "XPS DelayStage", XPS 4/8, ioc-mec-ppl-xps4 | Newport | visar_x | Yes | Yes |
VISAR_Y | MEC:PPL:MMN: |
31 | VacCable 2, T6/DB25-2, AirCable "XPS2 #4", XPS 4 |
/7, ioc-mec-ppl-xps4 | Newport | visar_y | Yes | Yes |
VISAR_Z | MEC:PPL:MMN: |
28 | VacCable 10, T6/5, AirCable "XPS2 #3/XPS2 #1", XPS 4/3, oc-mec-ppl-xps4 | Newport | visar_z | Yes | Yes |
Zyla_500mm | MEC:PPL:MMN:08 |
in-air to beam dump, XPS 1/8, ioc-mec-ppl-xps1 | Newport | zyla_z | Yes | Yes |
TC_hexapod | IOC:MEC:HEX1 |
B4/L8 | Hexapod | pending
| Yes | Moved, and re-initialized. | ||||||||
Target_X | MEC:USR:MMS:17 |
D2/D5 |
MF? moxa-mec-09:4001 (R62 E15), ioc-mec-usrppl-ims | PLS-85 |
Sample S | target_x | Yes | Yes. Homed to HLS and LLS, moved to 0. |
FXRTS_X |
MEC:TC1:MMS:09 | D2/D5 MF? digi-mec-07:2111 (R64A E19), ioc-mec-tc1-xuv-ims | XUV X | fxrts_x | Yes | Yes. Homed to HLS and LLS, moved to 0. | |
FXRTS_Y | MEC:TC1:MMS:08 | D2/D5 MF? digi-mec-07:2110 (R64A E19), ioc-mec-tc1-xuv-ims | XUV Y | fxrts_y | Yes | Yes. Homed to HLS and LLS, moved to 10. |
FXRTS_Z | MEC:TC1:MMS:07 | D2/D5 MF? digi-mec-07:2109 (R64A E19), ioc-mec-tc1-xuv-ims | XUV Z | fxrts_z | Yes | Yes. Homed to HLS and LLS, moved to 10. |
BXRTS_X | MEC:PPL:MMN:07 | VacCable 7, B7/H3, AirCable "XPS2 #3", Patch Panel #7, XPS 1/7, ioc-mec-ppl-xps1 | Newport | bxrts_x | Yes | Yes |
BXRTS_Y | MEC:PPL:MMN:11 | VacCable (no label), B7/H2, AirCable (no label), Patch Panel #11, XPS 2/3, ioc-mec-ppl-xps2 | Newport | bxrts_y | Yes
| Yes. |
BXRTS_Z | MEC:PPL:MMN:16 | VacCable (no label), B7/H5, Air Cable "XPS2 #2", Patch Panel #16, XPS 2/8, ioc-mec-ppl-xps2 | Newport | bxrts_z | Yes | yes |
Diode_Z | MEC:PPL:MMN:29 | VacCable 5, T6/7, AirCable "XPS3 #7", XPS 4/5, ioc-mec-ppl-xps4 | Newport | diode_z | Yes | Yes |
Diode_Y | MEC:PPL:MMN:30 | VacCable 11, Flange B5, port B2, AirCable "XPS1 #4", XPS 4/6, ioc-mec-ppl-xps4 | Newport | diode_y | Yes | Yes |
Beam_block | MEC:TC1:MMS:22 | T5/5 MF? moxa-mec-09:4005 (R62 E15), ioc-mec-tc1-vt50-ims | VT-50-100 |
block_z | Yes | Yes, soft limits 0-85 | ||||
JJ Slits | MEC:TC1:MMS:[17,18] MEC:TC1:MMS:[01,02] | T5/2 and T5/8 | Yes | No (limit switches no working) | ||
Filter wheel | MEC:USR:MMS:20 | Flange/FF? Cable #4 | Yes | Referenced. |
Detectors Checklist
Detector | DAQ alias | Connection | Cabled? | In DAQ? | ||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
epix10k-540k | quad_0 | Fiber:
Power: B3/Quad 0 | Yes | Yes. As Q0 for MPOD and fiber connections. | ||||||||
epix10k-540k | quad_3 | Fiber:
Power: B3/Quad 3 | Yes | Yes. As Q1 for MPOD and fiber connections. | ||||||||
ePix100 | epix100a_1_bxrts | Planned:Fiber pair from Flange D2d, power from the South epix-PDU feedthru on B3.
| Yes | Yesb_xrts | ||||||||
ePix100 | epix100a_2_fxrts | Planned: Fiber pair from Flange B2 Quad 2 (#5/#6), power from North epix-PDU feedthru on B3.
| Yes | Yes | ||||||||
ePix100 | epix100a_0_ | f_xrts | ePix100 | xpcs | in-air
| Yes | Yes | |||||
Andor Zyla | zyla | in-air USB/Fiber extender to daq-mec-cam02 | Yes | Yes | ||||||||
VISAR 1 | visar_1 | Network connection with Windows PC ioc-mec-visar1 | Yes | Yes Not tested right now since under regular use | ||||||||
VISAR_2 | visar_2 | Network connection with WIndows PC ioc-mec-visar2 | Yes | Yes Not tested right now since under regular use | ||||||||
Timing diode | PVs are:
| B3 ioc-mec-qadc. Timing fiber connected. Diode signal into A1 with SMA/Male - SSMC/Female Coaxial Jumper Cable and VLM-83-2W-S+ limiter. | Yes | qadc134 IOC is running. Here is how to display: PCIe Quad ADC Digitizer Boards (QADC and QADC134) - needs to be updated, see
27 March 2024: Diode is placed close to target during VISAR shots. Under test. | ||||||||
XRT spectrometer | hxsss | N/A | N/A | Testing planned for 28 March 2024. | ||||||||
XTCAV | ztcav | N/A | N/A | Testing planned for 28 March 2024. |