A place to track projections for hardware going into Building 50 - for power, space and cooling planning purposes.

Hardware Proposal: PPA has requested $600k of annual hardware funding from DoE to cover small experiment and peak computing needs. This is primarily for cycles; storage needs seem modest.

FY13-14 Projection/update

Raw inputs here

Fermi

$600k Options include

  • need ~3000 cores for 6 months for reprocessing, to be followed by similar load of MC sims.
  • replacing 2 Oracle servers
  • potentially another PB disk
  • unknown amount of tape (5 TB?)

ATLAS

  • curent allocation about 3400 cores. Agreed with ATLAS to increase  about 1000 cores. Always in use.

EXO

  • 200 core DC + bursts to 1000 needed

CDMS

  • much like EXO

KIPAC

  • "random" user needs approximated to 1600 cores

HPS

  • minimal at SLAC - Jefferson has agreed to provide the needed ~1M CPU-hrs
  • storage ~100 TB

BABAR

  • 2600 core allocation - no plan to add more in general queues. LTDA good for now?

HEP Theory

  • peak needs about 250k CPU-hrs in 1-2 week episodes: 1000-2000 cores

General Users

  • Allocation of about 2350 cores

Core numerology

Note: 1500 cores are hanging by a thread in the to-be-retired Black Boxes.

Rule of thumb used: 10 allocation units is ~1 core - taken from recent bqueues -l: yields about 12.5k cores total.

Code Block

USER/GROUP   SHARES  PRIORITY  STARTED  RESERVED  CPU_TIME  RUN_TIME
exoprodgrp   1000     333.333      0        0         0.0        0
lcdprodgrp    836     278.667      0        0         0.0        0
cdmsdata     1000     166.667      1        0         0.0   654048
rpgrp         418     139.333      0        0         0.0        0
glastdata   25174      40.806     29        0   2709927.5   297435
glastgrp     8107      20.155     67        0   1020309.2    24120
hpsprodgrp    600      16.304      4        0    112119.7    72947
lcd           418       7.420      7        0    166287.5   133324
rdgrp         342       1.275      0        0   1364227.6        0
babarAll    26332       1.132    989        0 104347464.0 16872557
glastusers   2000       1.087    361        0   3881826.5 16058350
AllUsers    23545       0.780   2092        0 123027648.0 18098542
theorygrp    1000       0.628      5        0   8096284.0   140116
atlasgrp    34307       0.606   3172        1 242260000.0 140770233

FY13 Projection

Fermi

$600k Options include

  • replacing 2 Oracle servers
  • 35 nodes to go into the general queues
  • potentially another 400 TB disk
  • unknown amount of tape (5 TB?)
BABAR
  • ballpark $100k in various areas - replacing old file servers, tape etc. Optimization not done yet.
ATLAS
LSST
EXO
  • $32k for disk
  • $20k for standalone linux servers
  • $5k tapes
CDMS
  • $16k for disk, but would prefer buying in to a shared storage solution

...

Anchor
midFY12
midFY12

Mid FY12 Update

Fermi

$500k left to spend in CY12. Options include

...

  • 2 cabinets of mostly storage
LSST
  • ?4-5 compute nodes
EXO

Hoping for the following. Not sure how much of the disk money is really left due to other EXO expenditures.

...

Storage

$

Standalone
servers

$

"Batch" nodes

$

Tape
Drives

 

Total $

1500 TB

500k

18

90k

55 60

275k 300k

4

70k

935k 960k


...

FY2012
BABAR

complete LTDA purchase - CD already knows the details. Retire old fileservers, using returned thumpers from Fermi.

...

Fermi

...

expect ~400 TB fileservers and 10 standalone linux servers. Presumably to be used for retiring old servers. 

...

Panel

The ATLAS Tier 2 projection is that we will spend about $220k on hardware (more if recharge costs are low, less if they are high). In addition, it is a reasonable guess that there will be up to $50k of other ATLAS-related purchases.

According to my rules of thumb, this will translate into at most 90 rack units and 27 kW dissipated.

We should also expect to retire our three oldest Thumpers, and offer to retire our 79 Sun X2200 M2s that are in one of the Black boxes.

KIPAC
Panel

- our FY11 CEP for storage should complete soonish with about 1/2 rack (4x4U + servers), power density is modest (~250W/U)
- FY12 is unclear, if we get the requested amounts then we would likely get ~48core/2U machines filling 2/3 rack at higher power
   density (700W/U)
DES:
- If DES uses BaBar leftovers, we need to keep those running and buy storage.  Estimated upper limit is 1/2 rack at modest power
   density (~250W/U)
  
So in summary we need something like 2 racks, one at high power and one and medium/low.  It is possible that something old gets retired
but nothing significant this year.

EXO