TimeItemWhoNotes
10 minBeamtime support update
CXI
  • ePix10k timing test
opportuniy
  • opportunity?
  • XCS/MFX constants status (PH train Bhavna on processing CI data?)
  • 30 minPriorities ReviewAll
    • 2021 events:
      • Projects new starts:
        • VFCCD/ePixM downselect → ePixM selected, science leadership has chosen smaller ePixM plus XPCS version.  Project plan in work.
        • SparkPix-S Phase II (full-size ASIC for sparsification , Tixel-based, underway, likely needs LGAD to meet PW specengine)
        • ePixHR V:  Prototype detector project underway, deliver sm camera in time for LDAC results.
        • TXI Detectors (2Mp and 140kp based on ePixHR @5kHz) CDR Closed out, project underway.
        • ePixUHR (130nm TSV structure to reach 100kHz), planning, need to consider SparkPix-ED results.
      • Production:
        • spare modules (0.5 & 1mm) Module order in work, new sensor order out
        • Approved 3d copy of ePix10k2m: underway, November delivery
        • Approved spare quads for MEC:  underway, August delivery
        • Proposed in-air 2m/1mm, planning in work.
        • Proposed UED detector upgrade, planning in work.
        • Proposed ePix10k4m (concept)
      • RIXS-CCD/cooler test and verification:  Delivery delayed until mid-July...readiness??  Parts ordered.
      • HiZ collaboration tests: SSRL LoI needed, Ge chamber tests
      • Outreach for R&D support (SparkPix-ED, SparkPix Delta).
      • Support effort for LCLS-II-HE instruments (performance verification/implementation planning)
      • SBIR effort for UXI.


    • Group priorities review:
      • Testing
        • Run 'standard' cal on two 10k smalls with new firmware, log tracker.
        • CompEnOn study during CXI checkout time?  111, 1a vs 19?
        • Any ePix100 detectors in ASC?  Can we figure out what's wrong with ePix100/7?
        • RIXS-CCD cooler test planning. 
      • Analysis
        • Gather and process relevant commissioning data for Mp travellers on Confluence.
            • Solid pedestals
            • Noise map
            • Response uniformity (mini-X cu-fluorescence)
            • Bootstrap gain (sealed source)
            • Linearity (signal injection)
      • Documentation
        • Complete on-line travellers for Mp detectors

      • Development

      • Lab 'commissioning'
        • DAQ
          • Storage nodes  configured, put in use?
          • LCLS I/II compatibility?
        • Chase racks anchored....cables, water status?
        • Vac chamber for in-lab tests?  Compatible with XPP alcove?


    Actions:


    30 minStatus

    Self-assessment period should be open...sequence accelerated this year...go ahead

    Cal team meet ton Friday??

    LDAC Panel assembled

    Coming up on self-assessment period...aiming for early salary adjustment period 


    KN:

    • Rayonix needs repair at Rayonix, do in August
    • XPP needs 4 ePix100 by July 1 plus 0.5m JF
    • LCLS-II DAQ not fully operational in ASC....needs resolution
    • @MFX for wave8 this week.FIM beamtime this weekend
    • Rayonix folks here this week.
    • Maciej has provided timing info for new 10ka firmware, needs more test.
    • Spare JF Power supply received, need cold plate.
    • UED MPOD?

    PH:

    • Started processing CI on CompEn exp....nothing jumps out.
    • MEC experiment on Thursday, detectors should be OK

    CH:

    • Small 10k still has fw problem
    • Measuring leakage via ACQ timing window
    • Will use portable vac chamber for Hi-Z

    RA:

    • Prepare for mid-july RIXS-CCD
    • Lost Derek, may need May Ling to help training on laser vibrometer
    • Need mtg for acceptance test planning (Friday)

    BN:

    • Min/max stitching.
    • Run cal on new ePix firmware.
    • Grafana setup to alert Slack channel.
    • Made updates to detector website, in work.
    • Working with PH on porting PyRoot to Python.

    CK:

    Run 19 deployment schedule through July.

    • Lesker chamber quote in work.Materials for chase cable trays.Ge chamber assembly
    • Order/borrow Variac.XPP having trouble with pgp server that runs 2M.


    5 minBudget Updatemmck
    • M&S Status (Through March)



    • Labor snapshot (December actuals):


    15 minReview ASC First Projectsall

    Coordinate/update lab schedule.

    10 minAny other business

    ...