Record PAMM close out as WPC and Housekeeping in:
Also use form to record any walk-throughs during the PAMM.
PAMM close out instructions on the edm panel are uptodate:
FACETHOME → Experiment/LI20 → PAMM:
These are the instructions from FACETHOME → Experiment/LI20 → PAMM:
- Keep up with documentation in eLog.
- Take photos to document new installations or changes.
- Pump down . . .
- Take a document position/focus of each Profile Monitor and send to eLog.
- Check MPS and EPS permits.
- Check that everything is extracted from beamline.
- Check vacuum.
- Update camera calibrations and ladder positions.
- Take trash to top of stairs (keep metal/non-metal separate).
- Make sure aisle is clear. Move carts to alcove under the stairs.
- Leave items for survey on shelf at top of stairs.