Search/Navigation:
Related:
SLAC/EPP/HPS Public
Jefferson Lab/Hall B/HPS Run Wiki
S30XL-LESA/LDMX
Logbook Engineering run SVT setup
Unpacking, prepping EEL clean room space.
SVT box installed. Ready to install U-channels.
LV and HV cables unpacked and run from MPOD to flange. LV cables ohmed out at MPOD end with FEB
FEB chiller connected to manifold and tested.
Got ATCA crate from hall.