Maps

DAQ Mapping

MPOD Power Map

Table Mapping as of 111/1719/2014 

GUI FEB IDPhysical FEBStatusComment
0L1t

OK

 
1

L2-3t

OK 
2L5tOK 
3L6tOK 
4L4tOK 
5L4bOK 
6L5bOK 
7L6bOK 
8L2-3bOK 
9L1bOK 
GUI Flange IDPhysical Flange BoardStatus
01 (top)OK
12OK
23OK
34 (bottom)OK

 

2015    

Image Added

1/28/2015

L1t is now FEB 01

L4b is now FEB 15

There are no FEBs mounted for L6t or L6b.

02/01/2015

L6b is now FEB 04

L6t is now FEB 13

 

Patch Panel Map

Low voltage:

DB44 connectorFEB #FEB #
P1L1tL2t
P2L5tL6t
P3L4tL4b
P4L5bL6b
P5L1bL2b

High voltage:

REDEL connectorFEBs
1Top half (top connector)
2Bottom half (bottom connector)

Image Added

Original high voltage GUI to physical hybrid mapping

link to excel file. 

Reloading PGP card drivers

Typically after a reboot we need to reload the pgp card driver. 

$ cd /u1/pgpcard/software/driver_old/

$ ./ pgpcard_load


 

OLD: Take a calibration run with expert SVT GUI

 

Start the DAQ:

 

$ cd /u1/software/software_new

...

Check that the hybrid currents measured are ok. Sync status for each channel can be seen in register RceCore/DataPath[x]/Synced, 1xf for powered channels.

 


 

Test Run SVT Group C Setup

 

Group C SVT test setup