Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Schedule Vn140 - Dec.11

Image Added

...

Done 8/4

...

 

 

 

 

 

 

 

...

 5. Module assembly L1-3 6. Module assembly L4-6 7. Survey--modules, u-channels, overall  overview and procedures needed 8. Mech assembly dry run 9. Motion control system check 10. inner cables-- layout, assembly,  and test 11. meazzanine boards--layout, fab, load, test 12. target--design, fab, check 13. wires--design, fab, check 14. flange cards 15. outer power cables 16. Chiller and cooling system checkout 17. PS checkout 18. Shipping boxes