Search/Navigation:
Related:
SLAC/EPP
/HPS Public
Jefferson Lab/Hall B
/HPS Run Wiki
S30XL-LESA/LDMX
Schedule Vn140 - Dec.11
...
Done 8/4
...
...
5. Module assembly L1-3 6. Module assembly L4-6 7. Survey--modules, u-channels, overall overview and procedures needed 8. Mech assembly dry run 9. Motion control system check 10. inner cables-- layout, assembly, and test 11. meazzanine boards--layout, fab, load, test 12. target--design, fab, check 13. wires--design, fab, check 14. flange cards 15. outer power cables 16. Chiller and cooling system checkout 17. PS checkout 18. Shipping boxes