Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Table 1.2

Value

Device Type

Controllable

VGBA

Vacuum Gauge Baratron

N

VGCM

Vacuum Capacitance Manometer

Y

VGKL

Vacuum Gauge associated with a Klystron

N

VGPR

Vacuum Pirani Gauge

N

VGCC

Vacuum Cold Cathode Gauge

Y

VGEX

Vacuum Extractor Gauge

Y

VGTC

Vacuum ThermoCouple Gauge

N

VGCP

Vacuum Convection-enhanced Pirani Gauge

N

VGHF

Vacuum Hot Filament Gauge

Y

VGOS

Vacuum Overpressure Switch

N

VGXX

Combination Vacuum Gauge

N

VVKL

Vacuum Valve associated with a Klystron

Y

VVPG

Vacuum Pneumatic Gate Valve

Y

VVMG

Vacuum Manual Gate Valve

N

VVPR

Vacuum Pneumatic Roughing Valve

Y

VVMR

Vacuum Manual Roughing Valve

N

VVPF

Vacuum Pneumatic Fore Valve

Y

VVMF

Vacuum Manual Fore Valve

N

VVPV

Vacuum Pneumatic Vent Valve

Y

VVMV

Vacuum Manual Vent Valve

N

VVFS

Vacuum Valve Fast Shutter

Y

VVFV

Vacuum Valve Fast Valve

Y

VVFL

Vacuum (Mass) Flow Valve

Y

VPKL

Vacuum Pump associated with a Klystron

Y

VPDF

Diffusion Pump

N

VPCR

CRyo Cryo Pump

Y

VPIO

IOn Pump

Y

VPTM

TurboMolecular Pump

Y

VPTS

Ti Sublimation Pump

Y

VPNI

Vacuum Pump NEG Ion Combination

Y

VPNG

Vacuum Pump NEG (Non-Evaporable Getter)

sometimes Y

VPFO

Fore Pump

Y

VPRO

Roughing Pump

Y

...

Table 1.10


Area

Physical Location

Access Buildings

ACR0

Accelerator Control Room (B052)

B005

Building 5

B24

Building 24  (development)

B25

Building 25  (development)

B34

Building 34  (development)

B44

Building 44 - Klystron Test Lab

B81

Building 81 - MMF 

B106

Building 106

B106

Building 136

B911

Building 911

B911

Building 911

B911

Building 911

B921

Building 921

ASTA-UED Facility Area

AS01

Accelerator Structure Test System

Injector Machine Areas

LR10

FACET-II Laser Room (Upstairs, near sector 10)

LR20

LCLS Laser Room (Upstairs, near sector 20)

LA20

FACET Laser Room (Upstairs, near Sector 20)

IN10

FACET-II Injector

IN20

LCLS Injector

LINAC Areas

LI00

LINAC Sector 0

LI20

LINAC Sector 20

LI21

LINAC Sector 21

LI22

LINAC Sector 22

LI23

LINAC Sector 23

LI24

LINAC Sector 24

LI25

LINAC Sector 25

LI26

LINAC Sector 26

LI27

LINAC Sector 27

LI28

LINAC Sector 28

LI29

LINAC Sector 29

LI30

LINAC Sector 30

Beam Switch Yard

For the entire beam switch yard area spanning from the wooden door to the Muon Shield, the device

positions shall range from 100-999, consistently across all beam lines, such that the unit numbers

 match up in Z-position across all beam lines.

MCC0

Main Control Center (B005) OBSOLETE. Replaced with ACR0

CLTH

Copper LINAC to Hard Line

CLTS

Copper LINAC to Soft Line

BSYH

Beam Switch Yard Hard Line

BSYS

Beam Switch Yard Soft Line

BSYA

Beam Switch Yard A-Line

SLTH

Superconducting LINAC to Hard Line

SLTS

Superconducting LINAC to Soft Line

SLTD

Superconducting LINAC to Dump Line

BSYS

Beam Switch Yard South Arc

LINAC to Undulator Machine Areas

LTU0

LINAC-to Undulator directly after BSY

LTU1

LINAC-to-Undulator Line 1

Undulator

UND1

Undulator on Line 1

Dump

DMP1

Beam Dump on Line 1

Photon Areas

FEE1

Front End Enclosure on Line 1

NEH1

Near Experimental Hall on Line 1

XRT1

X-Ray Tunnel on Line 1

FEH1

Far Experimental Hall on Line 1

XTA Facility Area

XT01

X-Band Test Area

Global Areas 

SYS0

LCLS-I System

SYS1

FACET and FACET-II System

SYS2

LCLS-II System

SYS3

LCLS-III System

SYS4

NLCTA System

SYS5

SPEAR Systems

SYS6

X-Band Test Area

SYS7

ASTA Test Area

SYS8

 Klystron Test Lab (B44)

SYS9

Site - HE Cryo Test Facility (IR4, etc.) and Radiation Monitoring outside gate

SYSW

Global System West

SYSE

Global System East

SITE

Remote SLAC Location, not associated with a service building

GBL0

Global to multiple Machines (decommissioned)

...

Table 1.11



Area

Position Prefix Codes

Physical Position

LR20

L

Laser Room (Upstairs, near sector 20)




IN20

B

Beam Line


K

Klystron Gallery


W

Waveguide


R

RF Equipment Hut


L

Laser Line


M

Manifold




LI20

B

Beam Line


W

Waveguide


K

Klystron Gallery


M

Manifold


E

Instrumentation Equipment Alcove




LI21

B

Beam Line


W

Waveguide


K

Klystron Gallery


M

Manifold


E

Instrumentation Equipment Alcove




LI22

B

Beam Line


W

Waveguide


K

Klystron Gallery


M

Manifold


E

Instrumentation Equipment Alcove




LI23

B

Beam Line


W

Waveguide


K

Klystron Gallery


M

Manifold


E

Instrumentation Equipment Alcove




LI24

B

Beam Line


W

Waveguide


K

Klystron Gallery


M

Manifold


E

Instrumentation Equipment Alcove




LI25

B

Beam Line


W

Waveguide


K

Klystron Gallery


M

Manifold


E

Instrumentation Equipment Alcove




LI26

B

Beam Line


W

Waveguide


K

Klystron Gallery


M

Manifold


E

Instrumentation Equipment Alcove




LI27

B

Beam Line


W

Waveguide


K

Klystron Gallery


M

Manifold


E

Instrumentation Equipment Alcove




LI28

B

Beam Line


W

Waveguide


K

Klystron Gallery


M

Manifold


E

Instrumentation Equipment Alcove




LI29

B

Beam Line


W

Waveguide


K

Klystron Gallery


M

Manifold


E

Instrumentation Equipment Alcove




LI30

B

Beam Line


W

Waveguide


K

Klystron Gallery


M

Manifold


E

Instrumentation Equipment Alcove




BSY0

B

Beam Line


E

Surface Equipment Building (Bldg 136, 106, 106, 5)


P

BSY Pump Station (P0, P1, P2, P3, P5)







BSYA

B

Beam Line


E

Surface Equipment Building (Bldg 136, 106, 106, 5)


P

BSY Pump Station (P0, P1, P2, P3, P5)







BSYB

B

Beam Line


E

Surface Equipment Building (Bldg 136, 106, 106, 5)


P

BSY Pump Station (P0, P1, P2, P3, P5)







BSYN

B

Beam Line


E

Surface Equipment Building (Bldg 136, 106, 106, 5)


P

BSY Pump Station (P0, P1, P2, P3, P5)




BSYS

B

Beam Line


E

Surface Equipment Building (Bldg 136, 106, 106, 5)


P

BSY Pump Station (P0, P1, P2, P3, P5)




LTU0

B

Beam Line


E

Surface Equipment Building (Bldg 5 or 911)




LTU1

B

Beam Line


E

Surface Equipment Building (Bldg 105 or Bldg 406 or


 P

Pump Line



Bldg 911 or Bldg 912 or Bldg 913)




MCC0

E

Equipment Rack Area (Bldg 5) OBSOLETE


C

Control Room




UND1

B

Beam Line


E

Surface Equipment Building (Bldg 913,921)




DMP1

B

Beam Line


E

Surface Equipment Building (Bldg B921)




FEE1

B

Beam Line



Hard (High-energy) through Branch (South) to Hutch 3 and beyond


1

Soft (Low-energy) Branch (North) to Hutch 1


2

Soft (Low-energy) Branch (Middle) to Hutch 2


E

Equipment Rack Alcove or Surface Equipment Building (Bldg 940)




NEH1

B

Beam Line



Hard (High-energy) Branch (South) to Hutch 3 and beyond


1

Soft (Low-energy) Branch (North) to Hutch 1


2

Soft (Low-energy) Branch (Middle) to Hutch 2


E

Surface Equipment Building (Bldg 950)




XRT1

B

Beam Line



Through Branch


4

North Branch to Hutch 4


5

Middle Branch to Hutch 5


6

South Branch to Hutch 6


E

Surface Equipment Building (Bldg 960)




FEH1

B

Beam Line


4

North Branch to Hutch 4


5

Middle Branch to Hutch 5


6

South Branch to Hutch 6


E

Surface Equipment Building (Bldg 999)

XT01

B

Beam Line



Surface Equipment Building (Bldb 062)

SYS0


LCLS-I System

SYS1


FACET and FACET-II System

SYS2


LCLS-II System

SYS3


LCLS-III System

SYS4


NLCTA System

SYS5


SPEAR System

SYS6


X-Band Test Area

SYS7


ASTA Test Area

SYS8


Klystron Test Lab (B44)

SYS9


Site - HE Cryo Test Facility (IR4,etc), Radiation Monitoring outside gate

SYSW


Global System West

SYSE


Global System East

GLB0


Global to all Machines

...