Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

costs are:

  • ATLAS: 60 blades @4.9375k 96730k => 296.25k 73k                    (960c) (Based on quote 659024769 for a non-IB full chassis)
  • Theory: 97.227k + 5*5.018k => 122   122.32k                     (336c)
  • PPA: 310.83k                       - 2.7k => 308.93                                     (352c)

...