  • Proposal is then to have SCCS (Teri Church +?) get quotes for 27 Dell C6220 servers with 4Gig/core, middle grade cpu speed etc.  The nominal networking would be 10GigE using the new 7000 series switches (provided by SCCS).  Also ask Teri to look at equivalent system from HP.
  • Storage scenarios?  Cluster storage is not long term.  Where does long term data go?  How paid for?  Is any long term storage needed this year?
  • Space,Power,Cooling planning -- Long term plan needed for ~10-15 racks, probably in one area.  (What is being retired? When?)
  • Use: Batch software: (LSF v8+?, condor, PBS Pro, others?, assign review team?)
  • Optimizing shared use: Single thread vs. single-host vs. many host (MPI).  Comparing orange cluster with generic batch config.