Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Page under construction

Announcement of the campaign (2012/02/

...

15)

The Fermi/LAT team is organizing a multi-wavelength campaign  on the blazar Markarian 501, starting on mid-February 2012 and finishing on July 2012.
This time interval provides with good visibility for optical/TeV instruments. The goal for this time interval is to sample every 4-6 days the peaks of the 2 components in the SED of Mrk501 (optical/X-ray and GeV/TeV)

...

The instruments participating in the campaign, together with the (approximate) observation schedule will be posted here