Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Analysis for Jan 14 to Jan 27 didn't reveal any patterns apart from heavy network utilization from midnight to 4am (Pakistan Daylight Time) in the morning. Possible reason could be data transfer between NCP and UETTAXILA. This is part of their research collaboration. Below is the strip graph from Jan 14 to Jan 27. Spreadsheet attached here.

<snip>
The details are:
 
Fresh batch came in on 27th Nov
Strike was on 9th Dec
The university was shut down 9-19 Dec
University was back on schedule 20th Dec 2010
Holidays (Reading week) started 7th Jan
Exams 17-23 Jan
Winter break 23rd Jan - 7th Feb
<snip>
Misc:
Available bandwidth: 16 Mbps. 
Throttled to 8Mbps --- for unknown reasons.
All multimedia access (e.g., youtube) is blocked
Bandwidth distributed between 5 buildings. (CS is consuming 4Mbps at the moment, while the other departments share the rest).
1. Electrical and Electronics 
2. Mechanical and Mechatronics 
3. T&IE (CS & Telecomm.)
4. Civil and Transportation 
5. Administration block
In addition to access control (using ACLs) each user's browsing activity is logged.
<snip>
The details are:

  • Fresh batch came in on 27th Nov
  • Strike was on 9th Dec
  • The university was shut down 9-19 Dec
  • University was back on schedule 20th Dec 2010
  • Holidays (Reading week) started 7th Jan
  • Exams 17-23 Jan
  • Winter break 23rd Jan - 7th Feb

...