Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

<ac:structured-macro ac:name="unmigrated-wiki-markup" ac:schema-version="1" ac:macro-id="19542df85407face-4efec308-428e44d6-ae22a747-91d3fb61c131e45d6dfffb6d"><ac:plain-text-body><![CDATA[

Throughput from SLAC to Regions of the World

Derived Throughput from SLAC to Africa Jan-Aug '09 [[xlsx

^africa-thru-aug09.xlsx]]

MinRTT from SLAC - Aug. 2009 [[xls

^map-africa-minrtt-aug2009.xls]]

]]></ac:plain-text-body></ac:structured-macro>

...

<ac:structured-macro ac:name="unmigrated-wiki-markup" ac:schema-version="1" ac:macro-id="7220a5bb610419d1-c6c25a55-493a4c4b-9be1b8e4-a14a0137616b2dc37e511113"><ac:plain-text-body><![CDATA[

Routing from South Africa to African Countries (Sep '05)

Routing from South Africa to African Countries (Aug '09) [[xls

^routing-africa-aug2009.xls]]

Routing from Burkina Faso to African Countries (Aug '09) [[xls

^routing-africa-aug2009.xls]]

]]></ac:plain-text-body></ac:structured-macro>



...

One host (www.aisha.ac.zm) of the 6 monitored in Zambia improved its RTT from about 720ms to 550ms on August 20, 2009 (see below).  Also at the time of writing it looks like they are still moving the link over to the terrestrial lines since the performance is very unstable (high losses) and there are big changes in RTT. It is possible the link in one direction is using a GEOS while the other is an all terrestrial link and the large dips to 400ms are when both legs are using terrestrial links. We believe the terrestrial path goes via Botswana and Namibia. The traceroute from SLAC on 9/9/09 appeared to use a satellite link in at least one direction. On October 2, 2009 Mike Jensen reported that the traceroute from Rome to www.aisha.ac.zm was well below 450ms and thus appears to be a terrestrial link. However the tracreoute from SLAC was still taking over 550ms.

Angola: www.novagest.co.ao

Namibia: www.adsl.com.na

Zambia: www.aisha.ac.zm




...

On September 6th, 2009 it was reported that the Glo-1 Submarine cable landed in Lagos, Nigeria. The 9800km cable is coming from Bude in the UK and connects Nigeria to the rest of West Africa and the UK. It has landing points in Nigeria, London and Lisbon in Portugal. It is deploying 16 branching units to connect countries in West Africa. It is a project jointly executed by Globacom and its partners, Alcatel Lucent. this brings competition to the SAT3/WASC/ cable consortium. In May 2010 the Main One cable will be landing on the West Coast of Africa.

Further Reading

MANGO-NET (Made in Africa NGO NETwork)

Internet prices to fall with surge in clients

Linking Tunisia with Italy