The original version of the Group-C to-do list (as of June 17 2009) is from Tim Nelson. Last update: 19 August 2009.
1- Room:
- Fix HVAC leak:
- to do: Philippe, talk to Tim to uderstand current status and what to do nextit's not leaking anymore (as of 19 August 2009).
- Phone installtion: DONE
- Fiber optic installation:
- Followed by Jim: Being done.
...
- Floor survey for 2.5" embedment: DONE. OK.
- Clean machine and computer as well as possible: DONE.
- Installation: DONE (July)
- Calibration: Jim has contacted the company DONE (18 and 20 August 2009).
3- Wirebonder: Installation DONE
...
- Fabricate anodized aluminium plate: Jim is taking care of it. Plate expected within a few months.DONE.
- Transfer hood to new plate; replace fabric with rubber flaps (neoprene?).
- need new plate.
- Need rack or table to hold test equipment.
- to do: have to figure out what is needed: inputs from Chris and Ryan.
- Clean.
- Install.
...
- Clean up and place in room: DONE.
- New (clean) computer for control: to do: order it: Vera is taking care of it DONE.
- Clean/new rack that fits under stand: we need a 19" rack. We will talk to Chris for recommendations.DONE.
- Fabricate hood similar to probe station: Jim is looking into it.DONE.
#* - Optics (ThorLabs): collimation, iris, splitter/power meter, spatial filter, focusing
- Mouting for optics
- Labview programming
...
- Get table replacement:
- John is contacting purchasing department.
- Setup scale and centrifuge
- Get centrifuge tubes: Talk to Tim for understand which sizes DONE.
- Get glue(West Systems", Hexcel?, Araldite TDR1100?, Hysol?):
- Ask Chris for recommendations
...