The original version of the Group-C to-do list (as of June 17 2009) is from Tim Nelson. Last update: 19 August 2009.

1- Room:
  1. Fix HVAC leak:
    • to do: Philippe, talk to Tim to uderstand current status and what to do nextit's not leaking anymore (as of 19 August 2009).
  2. Phone installtion: DONE
  3. Fiber optic installation:
    • Followed by Jim: Being done.

...

  1. Floor survey for 2.5" embedment: DONE. OK.
  2. Clean machine and computer as well as possible: DONE.
  3. Installation: DONE (July)
  4. Calibration: Jim has contacted the company DONE (18 and 20 August 2009).
3- Wirebonder: Installation DONE

...

  1. Fabricate anodized aluminium plate: Jim is taking care of it. Plate expected within a few months.DONE.
  2. Transfer hood to new plate; replace fabric with rubber flaps (neoprene?).
    • need new plate.
  3. Need rack or table to hold test equipment.
    • to do: have to figure out what is needed: inputs from  Chris and Ryan.
  4. Clean.
  5. Install.

...

  1. Clean up and place in room: DONE.
  2. New (clean) computer for control: to do: order it: Vera is taking care of it DONE.
  3. Clean/new rack that fits under stand: we need a 19" rack. We will talk to Chris for recommendations.DONE.
  4. Fabricate hood similar to probe station: Jim is looking into it.DONE.
    #*
  5. Optics (ThorLabs): collimation, iris, splitter/power meter, spatial filter, focusing
  6. Mouting for optics
  7. Labview programming

...

  1. Get table replacement:
    • John is contacting purchasing department.
  2. Setup scale and centrifuge
  3. Get centrifuge tubes: Talk to Tim for understand which sizes DONE.
  4. Get glue(West Systems", Hexcel?, Araldite TDR1100?, Hysol?):
    • Ask Chris for recommendations

...